
API RP 1117
API RP 1117, 3rd Edition: Recommended Practice for Movement in In-Service Pipelines
CDN $284.00
This publication was last reviewed and confirmed in 2024.
Recommended Practice for Movement in In-Service Pipelines
Description
This recommended practice covers the design, execution, inspection, and safety of a pipeline-lowering or other movement operation conducted while the pipeline is in service. (In this document, the terms lowering and movement can be used interchangeably.) This recommended practice presents general guidelines for conducting a pipeline-movement operation without taking the pipeline out of service. It also presents equations for estimating the induced stresses. To promote the safety of the movement operation, it describes stress limits and procedures. Additionally, it outlines recommendations to protect the pipeline against damage. The practicality and safety of trench types, support systems, and lowering or other methods are considered. Inspection procedures and limitations are presented.
Edition
3
Published Date
2009-08-17
Status
Current
Pages
42
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This recommended practice covers the design, execution, inspection, and safety of a pipeline-lowering or other movement operation conducted while the pipeline is in service. (In this document, the terms lowering and movement can be used interchangeably.) This recommended practice presents general guidelines for conducting a pipeline-movement operation without taking the pipeline out of service. It also presents equations for estimating the induced stresses. To promote the safety of the movement operation, it describes stress limits and procedures. Additionally, it outlines recommendations to protect the pipeline against damage. The practicality and safety of trench types, support systems, and lowering or other methods are considered. Inspection procedures and limitations are presented.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API RP 1109, 5th Edition: Line Markers and Signage for Hazardous Liquid Pipelines and Facilities
CDN $211.00 Add to cart -

API RP 1174, 1st Edition: Onshore Hazardous Liquid Pipeline Emergency Preparedness and Response (Previous Edition)
CDN $202.00 Add to cart -

API RP 1133, 2nd Edition: Managing Hydrotechnical Hazards for Pipelines located Onshore or within Coastal Areas
CDN $348.00 Add to cart -

API STD 1164: Errata
CDN $0.00 Add to cart







