Search
×
FR

Placeholder headline

This is just a placeholder headline

MSS SP-44-2026: Steel Pipeline Flanges

$

450

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 576: Inspection of Pressure-relieving Devices

$

460

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 591: Process Valve Qualification Procedure

$

226

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 576: Inspection of Pressure-relieving Devices: Addendum 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

API RP 1172

API RP 1172: Construction Parallel to Existing Underground Transmission Pipelines

CDN $184.00

This publication was last reviewed and confirmed in 2020.

SKU: 3856a2f18d1d Category:

Description

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Edition

1

Published Date

2014-04-29

Status

Reaffirmed

Pages

30

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Previous Editions

Can’t find what you are looking for?

Please contact us at: