Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

Placeholder headline

This is just a placeholder headline

Technical Report API TDB-4

$

245

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 1192 Transportation of Carbon Dioxide by Pipeline

$

323

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.8: Guidelines for Pre-loading Inspection of Marine Vessel Cargo Tanks and Their Cargo

$

223

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 14A: Subsurface Safety Valve and Annular Safety Valve Equipment

$

493

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16C: Choke and Kill Equipment

$

370

BUY NOW

API RP 1172

API RP 1172: Construction Parallel to Existing Underground Transmission Pipelines

CDN $184.00

This publication was last reviewed and confirmed in 2020.

SKU: 3856a2f18d1d Category:

Description

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Edition

1

Published Date

2014-04-29

Status

Reaffirmed

Pages

30

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

The primary emphasis of these guidelines is on the interaction between existing transmission pipeline operators and those planning to construct in a parallel fashion. These activities may involve many different parties. Contractors working on behalf of the Constructing Party, including environmental and survey professionals, design engineers, construction contractors, and operators of excavation and earth moving equipment should engage in work practices that are in conformance with these guidelines, and apply vigilance in identifying unanticipated circumstances that may indicate a problem. This RP refers to all of these entities as the “Constructing Party”. These guidelines have been developed such that they can be incorporated into contract documents executed with contractors and subcontractors by whichever party is involved in or responsible for construction activities.

Previous Editions

Can’t find what you are looking for?

Please contact us at: