Search
×
FR

Placeholder headline

This is just a placeholder headline

API STD 521: Guide for Pressure-relieving and Depressuring Systems – Edition 6

$

682

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 653: Tank Inspection, Repair, Alteration, and Reconstruction – Edition 4

$

507

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:19 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series-18: Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z246.2-14 – Emergency preparedness and response for petroleum and natural gas industry systems

$

596

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:22 – Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z731-09 (R2014) – Emergency Preparedness and Response

$

177

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:23 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:26 – Storage of Hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA B51:24 Boiler, Pressure Vessel, and Pressure Piping Code

$

389

BUY NOW

API RP 1188

API RP 1188: Hazardous Liquid Pipeline Facilities Integrity Management

CDN $206.00

SKU: ce609f65240a Category:

Description

This recommended practice (RP) covers the integrity management of hazardous liquid pipeline facilities. This RP provides guidance on: high-consequence area impact determinations; data integration; threat identification; risk assessment; inspection and reinspection; preventive and mitigative measures (P&MM); performance measures.

Facilities include terminal and pipeline station piping systems within terminal and pipeline facility boundaries and includes off-plot piping. Off-plot piping includes, but is not limited to, piping between facilities, piping that comes from or goes to a refinery or other type facility, or piping that may cross a road, ditch, or other property outside the confines of a terminal facility. This RP covers the integrity management of all pressure-containing components directly used in the transport or storage of hazardous liquids within a liquids pipeline facility.

Piping for transportation of hazardous liquids, such as but not limited to crude oil, highly vola

Edition

1

Published Date

2022-01-11

Status

Current

Pages

52

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This recommended practice (RP) covers the integrity management of hazardous liquid pipeline facilities. This RP provides guidance on: high-consequence area impact determinations; data integration; threat identification; risk assessment; inspection and reinspection; preventive and mitigative measures (P&MM); performance measures. Facilities include terminal and pipeline station piping systems within terminal and pipeline facility boundaries and includes off-plot piping. Off-plot piping includes, but is not limited to, piping between facilities, piping that comes from or goes to a refinery or other type facility, or piping that may cross a road, ditch, or other property outside the confines of a terminal facility. This RP covers the integrity management of all pressure-containing components directly used in the transport or storage of hazardous liquids within a liquids pipeline facility. Piping for transportation of hazardous liquids, such as but not limited to crude oil, highly vola

Previous Editions

Can’t find what you are looking for?

Please contact us at: