API RP 11S1
API RP 11S1: Electrical Submersible Pump Dismantle, Inspection and Failure Analysis
CDN $263.00
Description
This recommended practice (RP) covers the processes and procedures of collecting required information to complete a root cause failure analysis of an electrical submersible pump (ESP) system. These include:
• Procedures for disassembly, inspection, final report, failure classification and corrective actions. Items covered by this recommended practice include pumps, intakes, gas separators, gas handling devices, seals/protectors, motors (induction and permanent magnet motors), gauges, sensors, motor lead extensions, potheads,
and power cables. Tooling and test equipment may differ between suppliers; however, the typical assembly and inspection procedures and principles are generally applicable for most ESP systems.
• Information that should be collected prior to equipment dismantle and inspection as well as specific observations that should be recorded during equipment inspections/teardown/disassembly.
• General equipment drawings which may aid in identifying equipment components. It
Edition
4
Published Date
2022-04-26
Status
Current
Pages
60
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This recommended practice (RP) covers the processes and procedures of collecting required information to complete a root cause failure analysis of an electrical submersible pump (ESP) system. These include: • Procedures for disassembly, inspection, final report, failure classification and corrective actions. Items covered by this recommended practice include pumps, intakes, gas separators, gas handling devices, seals/protectors, motors (induction and permanent magnet motors), gauges, sensors, motor lead extensions, potheads, and power cables. Tooling and test equipment may differ between suppliers; however, the typical assembly and inspection procedures and principles are generally applicable for most ESP systems. • Information that should be collected prior to equipment dismantle and inspection as well as specific observations that should be recorded during equipment inspections/teardown/disassembly. • General equipment drawings which may aid in identifying equipment components. It
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API SPEC 11AX: Addenda 1
CDN $0.00 Add to cart -

API TR 10TR3: Temperatures for API Cement Operating Thickening Time Tests
CDN $338.00 Add to cart -

API RP 11BR: Recommended Practice for the Care and Handling of Sucker Rods: Reaffirmed
CDN $225.00 Add to cart -

API SPEC 10A: Addenda 1
CDN $0.00 Add to cart