
API RP 1FSC
API RP 1FSC: Facilities Systems Completion, Planning, and Execution
CDN $131.00
This publication was last reviewed and confirmed in 2020.
Description
This document applies to a wide variety of projects within the oil and gas industry excluding subsurface. Although intended for oil and gas industry, the process described in this document can be applied to other industries as well. It is intended that the processes and practices established herein can be adapted and applied from a single piece of tagged equipment to a complex petrochemical facility. The process described is intended to be applied at a system level. The systems completion process is the sequential activities within a project that verify and prove the construction, installation, integration, testing, and preparation of systems have been completed as designed, and thus, the facility is ready for start-up and operations. The systems completion process is designed to help prepare and manage the transfer of care, custody, and control of facilities under construction through appropriate certification and documentation, such that the details of progress are evident.
Edition
1
Published Date
2013-07-30
Status
Reaffirmed
Pages
20
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This document applies to a wide variety of projects within the oil and gas industry excluding subsurface. Although intended for oil and gas industry, the process described in this document can be applied to other industries as well. It is intended that the processes and practices established herein can be adapted and applied from a single piece of tagged equipment to a complex petrochemical facility. The process described is intended to be applied at a system level. The systems completion process is the sequential activities within a project that verify and prove the construction, installation, integration, testing, and preparation of systems have been completed as designed, and thus, the facility is ready for start-up and operations. The systems completion process is designed to help prepare and manage the transfer of care, custody, and control of facilities under construction through appropriate certification and documentation, such that the details of progress are evident.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API TR 10TR5: Technical Report on Methods for Testing of Solid and Rigid Centralizers
CDN $133.00 Add to cart -

API RP 11AR: Recommended Practice for Care and Use of Subsurface Pumps: Reaffirmed
CDN $268.00 Add to cart -

API RP 100-2: Environmental Aspects Associated with Exploration and Production Operations including
CDN $195.00 Add to cart -

API TR 10TR6: Evaluation and Testing of Mechanical Cement Wiper Plugs
CDN $195.00 Add to cart







