Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

Placeholder headline

This is just a placeholder headline

Technical Report API TDB-4

$

245

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 1192 Transportation of Carbon Dioxide by Pipeline

$

323

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.8: Guidelines for Pre-loading Inspection of Marine Vessel Cargo Tanks and Their Cargo

$

223

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 14A: Subsurface Safety Valve and Annular Safety Valve Equipment

$

493

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16C: Choke and Kill Equipment

$

370

BUY NOW

API RP 1FSC

API RP 1FSC: Facilities Systems Completion, Planning, and Execution

CDN $131.00

This publication was last reviewed and confirmed in 2020.

SKU: 22bb0f2b8f4d Category:

Description

This document applies to a wide variety of projects within the oil and gas industry excluding subsurface. Although intended for oil and gas industry, the process described in this document can be applied to other industries as well. It is intended that the processes and practices established herein can be adapted and applied from a single piece of tagged equipment to a complex petrochemical facility. The process described is intended to be applied at a system level. The systems completion process is the sequential activities within a project that verify and prove the construction, installation, integration, testing, and preparation of systems have been completed as designed, and thus, the facility is ready for start-up and operations. The systems completion process is designed to help prepare and manage the transfer of care, custody, and control of facilities under construction through appropriate certification and documentation, such that the details of progress are evident.

Edition

1

Published Date

2013-07-30

Status

Reaffirmed

Pages

20

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document applies to a wide variety of projects within the oil and gas industry excluding subsurface. Although intended for oil and gas industry, the process described in this document can be applied to other industries as well. It is intended that the processes and practices established herein can be adapted and applied from a single piece of tagged equipment to a complex petrochemical facility. The process described is intended to be applied at a system level. The systems completion process is the sequential activities within a project that verify and prove the construction, installation, integration, testing, and preparation of systems have been completed as designed, and thus, the facility is ready for start-up and operations. The systems completion process is designed to help prepare and manage the transfer of care, custody, and control of facilities under construction through appropriate certification and documentation, such that the details of progress are evident.

Previous Editions

Can’t find what you are looking for?

Please contact us at: