
API RP 2FPS
API RP 2FPS: Planning, Designing, and Constructing Floating Production Systems : Reaffirmed
CDN $399.00
This publication was last reviewed and confirmed in 2025.
Description
This recommended practice provides guidelines for design, fabrication, installation, inspection and operation of floating production systems (FPSs). A FPS may be designed with the capability of one or more stages of hydrocarbon processing, as well as drilling, well workover, product storage, and export. This document addresses only floating systems where a buoyant hull of some form supports the deck, production, and other systems. Bottom-fixed components, such as self-supporting risers, and station keeping systems, such as turret mooring, catenary anchor leg mooring (CALM), single anchor leg Mooring (SALM), etc. are considered as ancillary components and are addressed in more detail in other API recommended practices.
Edition
2
Published Date
2011-10-04
Status
Reaffirmed
Pages
203
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This recommended practice provides guidelines for design, fabrication, installation, inspection and operation of floating production systems (FPSs). A FPS may be designed with the capability of one or more stages of hydrocarbon processing, as well as drilling, well workover, product storage, and export. This document addresses only floating systems where a buoyant hull of some form supports the deck, production, and other systems. Bottom-fixed components, such as self-supporting risers, and station keeping systems, such as turret mooring, catenary anchor leg mooring (CALM), single anchor leg Mooring (SALM), etc. are considered as ancillary components and are addressed in more detail in other API recommended practices.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API RP 1145: Preparation of Response Plans for Oil Spills from Offshore Facilities
CDN $259.00 Add to cart -

API SPEC 10F: Errata 2
CDN $0.00 Add to cart -

API RP 10G: Product Evaluation, Application, and Testing of Stage Cementing Collars
CDN $276.00 Add to cart -

API TR 10TR4: Technnical Report on Considerations Regarding Selection of Centralizers for Primary Ce
CDN $133.00 Add to cart







