Search
×
FR

Placeholder headline

This is just a placeholder headline

API STD 521: Guide for Pressure-relieving and Depressuring Systems – Edition 6

$

682

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 653: Tank Inspection, Repair, Alteration, and Reconstruction – Edition 4

$

507

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:19 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series-18: Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z246.2-14 – Emergency preparedness and response for petroleum and natural gas industry systems

$

596

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:22 – Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z731-09 (R2014) – Emergency Preparedness and Response

$

177

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:23 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:26 – Storage of Hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA B51:24 Boiler, Pressure Vessel, and Pressure Piping Code

$

389

BUY NOW

API RP 2RIM

API RP 2RIM: Integrity Management of Risers from Floating Production Facilities

CDN $285.00

This publication was last reviewed and confirmed in 2026.

SKU: d6203c813714 Category:

Description

This recommended practice (RP) provides guidance for the integrity management (IM) of risers connected to a permanent floating production system (FPS) used for the drilling, development, production, and storage of hydrocarbons in offshore areas. For the purposes of this recommended practice, a riser has a top boundary that is somewhere at or above the point where it transfers load to the platform structure, and a lower boundary where it transfers load into a foundation, which could be a wellhead, pipeline or subsea structure. The scope of this RP includes: —  structural components of the riser; —  riser top hang-off assembly (i.e. stress joint, flexible joint, tensioner system/air can, bend stiffener); —  appurtenances attached to the riser that are critical to its integrity, including VIV suppression devices and buoyancy modules used to support the riser in any capacity; —  corrosion protection systems; —  insulation; —  other components in the load path or supporting the riser. T

Edition

1

Published Date

2019-09-10

Status

Reaffirmed

Pages

72

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This recommended practice (RP) provides guidance for the integrity management (IM) of risers connected to a permanent floating production system (FPS) used for the drilling, development, production, and storage of hydrocarbons in offshore areas. For the purposes of this recommended practice, a riser has a top boundary that is somewhere at or above the point where it transfers load to the platform structure, and a lower boundary where it transfers load into a foundation, which could be a wellhead, pipeline or subsea structure. The scope of this RP includes: —  structural components of the riser; —  riser top hang-off assembly (i.e. stress joint, flexible joint, tensioner system/air can, bend stiffener); —  appurtenances attached to the riser that are critical to its integrity, including VIV suppression devices and buoyancy modules used to support the riser in any capacity; —  corrosion protection systems; —  insulation; —  other components in the load path or supporting the riser. T

Previous Editions

Can’t find what you are looking for?

Please contact us at: