Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

Placeholder headline

This is just a placeholder headline

Technical Report API TDB-4

$

245

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 1192 Transportation of Carbon Dioxide by Pipeline

$

323

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.8: Guidelines for Pre-loading Inspection of Marine Vessel Cargo Tanks and Their Cargo

$

223

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 14A: Subsurface Safety Valve and Annular Safety Valve Equipment

$

493

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 16C: Choke and Kill Equipment

$

370

BUY NOW

API RP 2RIM

API RP 2RIM: Integrity Management of Risers from Floating Production Facilities

CDN $285.00

SKU: d6203c813714 Category:

Description

This recommended practice (RP) provides guidance for the integrity management (IM) of risers connected to a permanent floating production system (FPS) used for the drilling, development, production, and storage of hydrocarbons in offshore areas. For the purposes of this recommended practice, a riser has a top boundary that is somewhere at or above the point where it transfers load to the platform structure, and a lower boundary where it transfers load into a foundation, which could be a wellhead, pipeline or subsea structure. The scope of this RP includes: —  structural components of the riser; —  riser top hang-off assembly (i.e. stress joint, flexible joint, tensioner system/air can, bend stiffener); —  appurtenances attached to the riser that are critical to its integrity, including VIV suppression devices and buoyancy modules used to support the riser in any capacity; —  corrosion protection systems; —  insulation; —  other components in the load path or supporting the riser. T

Edition

1

Published Date

2019-09-10

Status

Current

Pages

72

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This recommended practice (RP) provides guidance for the integrity management (IM) of risers connected to a permanent floating production system (FPS) used for the drilling, development, production, and storage of hydrocarbons in offshore areas. For the purposes of this recommended practice, a riser has a top boundary that is somewhere at or above the point where it transfers load to the platform structure, and a lower boundary where it transfers load into a foundation, which could be a wellhead, pipeline or subsea structure. The scope of this RP includes: —  structural components of the riser; —  riser top hang-off assembly (i.e. stress joint, flexible joint, tensioner system/air can, bend stiffener); —  appurtenances attached to the riser that are critical to its integrity, including VIV suppression devices and buoyancy modules used to support the riser in any capacity; —  corrosion protection systems; —  insulation; —  other components in the load path or supporting the riser. T

Previous Editions

Can’t find what you are looking for?

Please contact us at: