
API RP 2RIM
API RP 2RIM: Integrity Management of Risers from Floating Production Facilities
CDN $285.00
Description
This recommended practice (RP) provides guidance for the integrity management (IM) of risers connected to a permanent floating production system (FPS) used for the drilling, development, production, and storage of hydrocarbons in offshore areas. For the purposes of this recommended practice, a riser has a top boundary that is somewhere at or above the point where it transfers load to the platform structure, and a lower boundary where it transfers load into a foundation, which could be a wellhead, pipeline or subsea structure. The scope of this RP includes: —  structural components of the riser; —  riser top hang-off assembly (i.e. stress joint, flexible joint, tensioner system/air can, bend stiffener); —  appurtenances attached to the riser that are critical to its integrity, including VIV suppression devices and buoyancy modules used to support the riser in any capacity; —  corrosion protection systems; —  insulation; —  other components in the load path or supporting the riser. T
Edition
1
Published Date
2019-09-10
Status
Current
Pages
72
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This recommended practice (RP) provides guidance for the integrity management (IM) of risers connected to a permanent floating production system (FPS) used for the drilling, development, production, and storage of hydrocarbons in offshore areas. For the purposes of this recommended practice, a riser has a top boundary that is somewhere at or above the point where it transfers load to the platform structure, and a lower boundary where it transfers load into a foundation, which could be a wellhead, pipeline or subsea structure. The scope of this RP includes: —  structural components of the riser; —  riser top hang-off assembly (i.e. stress joint, flexible joint, tensioner system/air can, bend stiffener); —  appurtenances attached to the riser that are critical to its integrity, including VIV suppression devices and buoyancy modules used to support the riser in any capacity; —  corrosion protection systems; —  insulation; —  other components in the load path or supporting the riser. T
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API SPEC 10D: Casing Bow-spring Centralizers
CDN $212.00 Add to cart -

API TR 10TR6: Evaluation and Testing of Mechanical Cement Wiper Plugs
CDN $195.00 Add to cart -

API SPEC 11D1: Addenda 1
CDN $0.00 Add to cart -

API RP 10G: Product Evaluation, Application, and Testing of Stage Cementing Collars
CDN $276.00 Add to cart







