
API RP 554, Part 2
API RP 554, Part 2: Process Control Systems-Process Control System Design
CDN $300.00
Description
This recommended practice (RP) addresses the processes required to successfully implement PCSs for oil and gas production, refinery, and petrochemical services. The major topics addressed are listed below.
– Part 1. The basic functions that a PCS may need to perform, and recommended methodologies for determining the functional and integration requirements for a particular application.
– Part 2. Practices to select and design the installation for hardware and software required to meet the functional and integration requirements.
– Part 3. Project organization, skills, and management required to execute a process control project and then to own and operate a PCS.
The general scope of the material covers general industrial process control topics that are applicable to oil and gas production, refineries, and petrochemical facilities.
Edition
2
Published Date
2023-08-30
Status
Current
Pages
78
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This recommended practice (RP) addresses the processes required to successfully implement PCSs for oil and gas production, refinery, and petrochemical services. The major topics addressed are listed below. - Part 1. The basic functions that a PCS may need to perform, and recommended methodologies for determining the functional and integration requirements for a particular application. - Part 2. Practices to select and design the installation for hardware and software required to meet the functional and integration requirements. - Part 3. Project organization, skills, and management required to execute a process control project and then to own and operate a PCS. The general scope of the material covers general industrial process control topics that are applicable to oil and gas production, refineries, and petrochemical facilities.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API RP 2028: Flame Arresters in Piping Systems
CDN $129.00 Add to cart -

API RP 2510A: Fire-Protection Considerations for the Design and Operation of Liquefied Petroleum Gas (Not Current)
CDN $217.00 Add to cart -

API STD 2510: Design and Construction of LPG Installations
CDN $262.00 Add to cart -

API STD 12R1: Addenda 1
CDN $0.00 Add to cart







