
API RP 581
API RP 581, 3rd Edition: Risk-Based Inspection Methodology
CDN $1,870.00
Risk-Based Inspection Methodology
Description
This recommended practice, API RP 581 Risk-Based Inspection Methodology, provides quantitative procedures to establish an inspection program using risk-based methods for pressurized fixed equipment including pressure vessel, piping, tankage, pressure relief devices (PRDs), and heat exchanger tube bundles. API RP 580 Risk-Based Inspection provides guidance for developing Risk-Based Inspection (RBI) programs on fixed equipment in refining, petrochemical, chemical process plants and oil and gas production facilities. The intent is for API RP 580 to introduce the principles and present minimum general guidelines for RBI while this recommended practice provides quantitative calculation methods to determine an inspection plan. The calculation of risk outlined in API RP 581 involves the determination of a probability of failure (POF) combined with the consequence of failure (COF). Failure is defined as a loss of containment from the pressure boundary resulting in leakage to the atmosphere or
Edition
3
Published Date
2016-04-12
Status
Current
Pages
652
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This recommended practice, API RP 581 Risk-Based Inspection Methodology, provides quantitative procedures to establish an inspection program using risk-based methods for pressurized fixed equipment including pressure vessel, piping, tankage, pressure relief devices (PRDs), and heat exchanger tube bundles. API RP 580 Risk-Based Inspection provides guidance for developing Risk-Based Inspection (RBI) programs on fixed equipment in refining, petrochemical, chemical process plants and oil and gas production facilities. The intent is for API RP 580 to introduce the principles and present minimum general guidelines for RBI while this recommended practice provides quantitative calculation methods to determine an inspection plan. The calculation of risk outlined in API RP 581 involves the determination of a probability of failure (POF) combined with the consequence of failure (COF). Failure is defined as a loss of containment from the pressure boundary resulting in leakage to the atmosphere or
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API RP 2210, 3rd Edition: Flame Arresters for Vents of Tanks Storing Petroleum Products
CDN $140.00 Add to cart -

API STD 2610, 3rd Edition: Design, Construction, Operation, Maintenance and Inspection of Terminal and Tank Facilities (Previous Edition)
CDN $387.00 Add to cart -

API RP 2218, 3rd Edition: Fireproofing Practices in Petroleum and Petrochemical Processing Plants
CDN $348.00 Add to cart -

API PUBL 4599, 1st Edition: Interlaboratory Study of Three Methods for Analyzing Petroleum Hydrocarbons in Soils
CDN $210.00 Add to cart







