
API RP 752
API RP 752: Management of Hazards Associated with Location of Process Plant Permanent Buildings
CDN $304.00
Description
This recommended practice (RP) provides guidance for managing the risk from explosions, fires and toxic material releases to on-site personnel located in new and existing buildings intended for occupancy. This RP was developed for use at refineries, petrochemical and chemical operations, natural gas liquids extraction plants, natural gas liquefaction plants, and other onshore facilities covered by the OSHA Process Safety Management of Highly Hazardous Chemicals, 29 CFR 1910.119. Buildings covered by this RP are rigid structures intended for permanent use in fixed locations. Tents, fabric enclosures and other soft-sided structures are outside the scope of this document. This third edition of API RP 752:2009 supersedes all previous editions, including the technical data provided in those documents. Significant research and development of technology pertinent to building siting evaluations has been performed since the publication of the previous editions of API RP 752.
Edition
4
Published Date
2024-01-16
Status
Current
Pages
68
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This recommended practice (RP) provides guidance for managing the risk from explosions, fires and toxic material releases to on-site personnel located in new and existing buildings intended for occupancy. This RP was developed for use at refineries, petrochemical and chemical operations, natural gas liquids extraction plants, natural gas liquefaction plants, and other onshore facilities covered by the OSHA Process Safety Management of Highly Hazardous Chemicals, 29 CFR 1910.119. Buildings covered by this RP are rigid structures intended for permanent use in fixed locations. Tents, fabric enclosures and other soft-sided structures are outside the scope of this document. This third edition of API RP 752:2009 supersedes all previous editions, including the technical data provided in those documents. Significant research and development of technology pertinent to building siting evaluations has been performed since the publication of the previous editions of API RP 752.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API TR 10TR1: Cement Sheath Evaluation
CDN $311.00 Add to cart -

API SPEC 11AX: Addenda 1
CDN $0.00 Add to cart -

API RP 100-2: Environmental Aspects Associated with Exploration and Production Operations including
CDN $195.00 Add to cart -

API TR 10TR6: Evaluation and Testing of Mechanical Cement Wiper Plugs
CDN $195.00 Add to cart







