
API RP-79-2
API RP-79-2, 1st Edition: API RP 79-2: Tripping Operations with Surface Back-pressure Managed Pressure Drilling with Subsea Blowout Preventer
CDN $148.00
This publication was last reviewed and confirmed in 2025.
API RP 79-2: Tripping Operations with Surface Back-pressure Managed Pressure Drilling with Subsea Blowout Preventer
Description
This document provides guidelines for tripping operations with surface back-pressure managed pressure drilling in accordance with API Recommended Practice 92M. This document does not address operations with service gas (e.g. nitrogen) injection.
Recommended Practice 79-2 is one of three API documents on tripping operations. The others are:
- Recommended Practice 79-1, Tripping Operations in Hydrostatically Overbalanced Wells, 1st Edition
- Recommended Practice 79-3, Tripping Operations with Surface Backpressure Managed Pressure Drilling with Subsea Blowout Preventer, 1st Edition
Edition
1
Published Date
2025-12-03
Status
Current
Pages
39
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This document provides guidelines for tripping operations with surface back-pressure managed pressure drilling in accordance with API Recommended Practice 92M. This document does not address operations with service gas (e.g. nitrogen) injection.
Recommended Practice 79-2 is one of three API documents on tripping operations. The others are:
- Recommended Practice 79-1, Tripping Operations in Hydrostatically Overbalanced Wells, 1st Edition
- Recommended Practice 79-3, Tripping Operations with Surface Backpressure Managed Pressure Drilling with Subsea Blowout Preventer, 1st Edition
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API RP 11BR, 9th Edition: Recommended Practice for the Care and Handling of Sucker Rods
CDN $225.00 Add to cart -

API TR 10TR6, 1st Edition: Evaluation and Testing of Mechanical Cement Wiper Plugs
CDN $196.00 Add to cart -

API SPEC 10F: Errata
CDN $0.00 Add to cart -

API RP 1145, 2nd Edition: Preparation of Response Plans for Oil Spills from Offshore Facilities
CDN $260.00 Add to cart







