
API RP 932-B
API RP 932-B, 3rd Edition: Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Con
CDN $587.00
Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Con
Description
Provides guidance to engineering and plant personnel on equipment and piping design, material selection, fabrication, operation, and inspection practices to manage corrosion and fouling in the wet sections of hydroprocessing reactor effluent systems. The reactor effluent system includes the equipment and piping subject to ammonium salting, NH4HS corrosion, and associated fouling. This system usually begins at the last feed/effluent exchanger or first water injection point and continues through the cold high-pressure separator (1, 2, and 3 separator designs) or cold high- and low-pressure separators (4 and 5 separator designs). The reactor effluent system specifically excludes the stripper, fractionator, and final separation sections. However, guidance in this document may be applicable to ammonium salt corrosion mitigation in those areas, as well. The majority of these systems have an air cooler; however, some systems utilize only shell and tube heat exchangers. Reactor effluent system
Edition
3
Published Date
2019-06-12
Status
Current
Pages
70
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
Provides guidance to engineering and plant personnel on equipment and piping design, material selection, fabrication, operation, and inspection practices to manage corrosion and fouling in the wet sections of hydroprocessing reactor effluent systems. The reactor effluent system includes the equipment and piping subject to ammonium salting, NH4HS corrosion, and associated fouling. This system usually begins at the last feed/effluent exchanger or first water injection point and continues through the cold high-pressure separator (1, 2, and 3 separator designs) or cold high- and low-pressure separators (4 and 5 separator designs). The reactor effluent system specifically excludes the stripper, fractionator, and final separation sections. However, guidance in this document may be applicable to ammonium salt corrosion mitigation in those areas, as well. The majority of these systems have an air cooler; however, some systems utilize only shell and tube heat exchangers. Reactor effluent system
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API PUBL 4783, 1st Edition: Water Management and Stewardship in Midstream, Downstream, and Delivery Operations in
CDN $163.00 Add to cart -

API STD 2610, 3rd Edition: Design, Construction, Operation, Maintenance and Inspection of Terminal and Tank Facilities (Previous Edition)
CDN $389.00 Add to cart -

API RP 2009, 8th Edition: Safe Welding, Cutting and Hot Work Practices in the Petroleum and Petrochemical Industr
CDN $210.00 Add to cart -

API PUBL 1629, 1st Edition: Guide for Assessing and Remediating Petroleum Hydrocarbons in Soils
CDN $328.00 Add to cart







