Search
×
FR

Placeholder headline

This is just a placeholder headline

BPVC.V-2025: Section V, Nondestructive Examination

$

1241

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.I-2025: Section I, Rules for Construction of Power Boilers

$

1074

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.VII-2025: Section VII, Recommended Guidelines for the Care of Power Boilers

$

653

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.IV-2025: Section IV, Rules for Construction of Heating Boilers

$

1098

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.VI-2025: Section VI, Recommended Rules for the Care and Operation of Heating Boilers

$

653

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.CC.BPV.S1-2025: 2025 ASME BPVC Code Cases: Boilers and Pressure Vessels, Supplement 1

$

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.X-2025: Section X, Fiber-Reinforced Plastic Pressure Vessels

$

979

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.I-2023: Section I, Rules for Construction of Power Boilers (Previous Edition)

$

963

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.IV-2023: Section IV, Rules for Construction of Heating Boilers (Previous Edition)

$

979

BUY NOW

API RP 932-B

API RP 932-B, 3rd Edition: Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Con

CDN $581.00

Design, Materials, Fabrication, Operation, and Inspection Guidelines for Corrosion Con

SKU: 890c2db7a900 Category:

Description

Provides guidance to engineering and plant personnel on equipment and piping design, material selection, fabrication, operation, and inspection practices to manage corrosion and fouling in the wet sections of hydroprocessing reactor effluent systems. The reactor effluent system includes the equipment and piping subject to ammonium salting, NH4HS corrosion, and associated fouling. This system usually begins at the last feed/effluent exchanger or first water injection point and continues through the cold high-pressure separator (1, 2, and 3 separator designs) or cold high- and low-pressure separators (4 and 5 separator designs). The reactor effluent system specifically excludes the stripper, fractionator, and final separation sections. However, guidance in this document may be applicable to ammonium salt corrosion mitigation in those areas, as well. The majority of these systems have an air cooler; however, some systems utilize only shell and tube heat exchangers. Reactor effluent system

Edition

3

Published Date

2019-06-12

Status

Current

Pages

70

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

Provides guidance to engineering and plant personnel on equipment and piping design, material selection, fabrication, operation, and inspection practices to manage corrosion and fouling in the wet sections of hydroprocessing reactor effluent systems. The reactor effluent system includes the equipment and piping subject to ammonium salting, NH4HS corrosion, and associated fouling. This system usually begins at the last feed/effluent exchanger or first water injection point and continues through the cold high-pressure separator (1, 2, and 3 separator designs) or cold high- and low-pressure separators (4 and 5 separator designs). The reactor effluent system specifically excludes the stripper, fractionator, and final separation sections. However, guidance in this document may be applicable to ammonium salt corrosion mitigation in those areas, as well. The majority of these systems have an air cooler; however, some systems utilize only shell and tube heat exchangers. Reactor effluent system

Previous Editions

Can’t find what you are looking for?

Please contact us at: