
API RP 95J
API RP 95J: Gulf of Mexico Jackup Operations for Hurricane Season
CDN $135.00
This publication was last reviewed and confirmed in 2026.
Description
Presents an approach to siting jackup mobile offshore drilling units (MODUs) and to recommend certain operational procedures to enhance Jackup survivability and stationkeeping during hurricane season in the Gulf of Mexico during drilling, workover, and while stacked (idled) at a non-sheltered location. This RP provides guidance and processes and when combined with an understanding of the environment at a particular location, the characteristics of the unit being utilized, and other factors, may be used to enhance operational integrity. This RP was developed through a cooperative arrangement with the International Association of Drilling Contractors (IADC) Jackup Rig Committee. Specifically, this RP provides guidance in the following areas: • Site – including location-specific, geotechnical, and metocean • Preloading Process • Air Gap Recommendations • Unit Preparations and Evacuation • Post Storm Recovery • Post Storm Inspections
Edition
1
Published Date
2006-06-01
Status
Reaffirmed
Pages
24
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
Presents an approach to siting jackup mobile offshore drilling units (MODUs) and to recommend certain operational procedures to enhance Jackup survivability and stationkeeping during hurricane season in the Gulf of Mexico during drilling, workover, and while stacked (idled) at a non-sheltered location. This RP provides guidance and processes and when combined with an understanding of the environment at a particular location, the characteristics of the unit being utilized, and other factors, may be used to enhance operational integrity. This RP was developed through a cooperative arrangement with the International Association of Drilling Contractors (IADC) Jackup Rig Committee. Specifically, this RP provides guidance in the following areas: • Site - including location-specific, geotechnical, and metocean • Preloading Process • Air Gap Recommendations • Unit Preparations and Evacuation • Post Storm Recovery • Post Storm Inspections
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API RP 10B-6: Recommended Practice on Determining the Static Gel Strength of Cement Formulations
CDN $135.00 Add to cart -

API RP 11AR: Recommended Practice for Care and Use of Subsurface Pumps: Reaffirmed
CDN $268.00 Add to cart -

API RP 100-1: Hydraulic Fracturing — Well Integrity and Fracture Containment
CDN $195.00 Add to cart -

API RP 10B-5: Recommended Practice on Determination of Shrinkage and Expansion of Well Cement Formul
CDN $173.00 Add to cart







