
API SPEC 19CI
API SPEC 19CI: Downhole Chemical Injection Devices and Related Equipment
CDN $338.00
Description
This specification provides requirements for chemical injection devices intended for use in the worldwide petroleum and natural gas industry. This includes requirements for specifying, selecting, design verification, validation testing, manufacturing, quality control, testing, and preparation for shipping of chemical injection devices. These requirements include in-line debris screen systems, single-use shearable/frangible devices, and information on performance testing and calibration procedures. The installation and retrieval of chemical Injection devices and systems is outside the scope of this document (see API 19G2 and API 19G3). This document does not include requirements for mandrels, carriers, running, pulling, and kick-over tools, handling tools and latches, injection lines, fittings, control line connectors, clamps, chemicals and chemical delivery systems. Service, repair or redress of used chemical injection devices is outside of the scope of this document.
Edition
1
Published Date
2019-06-14
Status
Current
Pages
118
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This specification provides requirements for chemical injection devices intended for use in the worldwide petroleum and natural gas industry. This includes requirements for specifying, selecting, design verification, validation testing, manufacturing, quality control, testing, and preparation for shipping of chemical injection devices. These requirements include in-line debris screen systems, single-use shearable/frangible devices, and information on performance testing and calibration procedures. The installation and retrieval of chemical Injection devices and systems is outside the scope of this document (see API 19G2 and API 19G3). This document does not include requirements for mandrels, carriers, running, pulling, and kick-over tools, handling tools and latches, injection lines, fittings, control line connectors, clamps, chemicals and chemical delivery systems. Service, repair or redress of used chemical injection devices is outside of the scope of this document.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API RP 100-1: Hydraulic Fracturing — Well Integrity and Fracture Containment
CDN $195.00 Add to cart -

API RP 10B-6: Recommended Practice on Determining the Static Gel Strength of Cement Formulations
CDN $135.00 Add to cart -

API RP 11AR: Recommended Practice for Care and Use of Subsurface Pumps: Reaffirmed
CDN $268.00 Add to cart -

API SPEC 10F: Cementing Float Equipment Testing
CDN $160.00 Add to cart







