Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

B51-14 (R2019) – Boiler, pressure vessel, and pressure piping code

$

362

BUY NOW

API STD 653

API STD 653, 5th Edition: Tank Inspection, Repair, Alteration, and Reconstruction

CDN $513.00

This publication was last reviewed and confirmed in 2025.

Tank Inspection, Repair, Alteration, and Reconstruction – Edition 5

Category:

Description

This standard covers steel storage tanks built to API 650 and its predecessor API 12C. It provides minimum requirements for maintaining the integrity of such tanks after they have been placed in service and addresses inspection, repair, alteration, relocation, and reconstruction. The scope is limited to the tank foundation, bottom, shell, structure, roof, attached appurtenances, and nozzles to the face of the first flange, first threaded joint, or first welding-end connection. Many of the design, welding, examination, and material requirements of API 650 can be applied in the maintenance inspection, rating, repair, and alteration of in-service tanks. In the case of apparent conflicts between the requirements of this standard and API 650 or its predecessor API 12C, this standard shall govern for tanks that have been placed in service. This standard employs the principles of API 650; however, storage tank owner/operators, based on consideration of specific construction and operating design

Edition

5

Published Date

2025-07-20

Status

Current

Pages

192

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This standard covers steel storage tanks built to API 650 and its predecessor API 12C. It provides minimum requirements for maintaining the integrity of such tanks after they have been placed in service and addresses inspection, repair, alteration, relocation, and reconstruction. The scope is limited to the tank foundation, bottom, shell, structure, roof, attached appurtenances, and nozzles to the face of the first flange, first threaded joint, or first welding-end connection. Many of the design, welding, examination, and material requirements of API 650 can be applied in the maintenance inspection, rating, repair, and alteration of in-service tanks. In the case of apparent conflicts between the requirements of this standard and API 650 or its predecessor API 12C, this standard shall govern for tanks that have been placed in service. This standard employs the principles of API 650; however, storage tank owner/operators, based on consideration of specific construction and operating design

Previous Editions

Can’t find what you are looking for?

Please contact us at: