Search
×
FR

Placeholder headline

This is just a placeholder headline

BPVC.V-2025: Section V, Nondestructive Examination

$

1241

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.I-2025: Section I, Rules for Construction of Power Boilers

$

1074

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.VII-2025: Section VII, Recommended Guidelines for the Care of Power Boilers

$

653

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.IV-2025: Section IV, Rules for Construction of Heating Boilers

$

1098

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.VI-2025: Section VI, Recommended Rules for the Care and Operation of Heating Boilers

$

653

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.CC.BPV.S1-2025: 2025 ASME BPVC Code Cases: Boilers and Pressure Vessels, Supplement 1

$

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.X-2025: Section X, Fiber-Reinforced Plastic Pressure Vessels

$

979

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.I-2023: Section I, Rules for Construction of Power Boilers (Previous Edition)

$

963

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.IV-2023: Section IV, Rules for Construction of Heating Boilers (Previous Edition)

$

979

BUY NOW

API STD 669

API STD 669, 1st Edition: Heat Recovery Systems

CDN $273.00

Heat Recovery Systems

SKU: 2b4f50accd19 Category:

Description

This recommended practice (RP) provides guidelines for heat transfer equipment used in waste heat recovery systems in the petroleum, petrochemical and natural gas industries. Details of related equipment designs are included only where these are necessary to ensure proper design and operation and safe interaction with the heat recovery system. It indicates areas that need attention and offers information and descriptions of various types of heat transfer equipment available to aid in the selection of the appropriate heat recovery system. This RP does not include detailed requirements for: process to process heat recovery systems, gas turbine exhaust heat recovery, CO boilers, or convection sections used within fired heaters. The waste heat recovery systems included in this RP are typical of those currently in use and should not limit the use of alternate systems. Instrumentation and controls for waste heat recovery systems are sometimes mentioned but is not meant to completely define

Edition

1

Published Date

2022-06-28

Status

Current

Pages

90

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This recommended practice (RP) provides guidelines for heat transfer equipment used in waste heat recovery systems in the petroleum, petrochemical and natural gas industries. Details of related equipment designs are included only where these are necessary to ensure proper design and operation and safe interaction with the heat recovery system. It indicates areas that need attention and offers information and descriptions of various types of heat transfer equipment available to aid in the selection of the appropriate heat recovery system. This RP does not include detailed requirements for: process to process heat recovery systems, gas turbine exhaust heat recovery, CO boilers, or convection sections used within fired heaters. The waste heat recovery systems included in this RP are typical of those currently in use and should not limit the use of alternate systems. Instrumentation and controls for waste heat recovery systems are sometimes mentioned but is not meant to completely define

Previous Editions

Can’t find what you are looking for?

Please contact us at: