
API TR 17TR5
API TR 17TR5, 1st Edition: Avoidance of Blockages in Subsea Production Control and Chemical Injection Systems
CDN $211.00
Avoidance of Blockages in Subsea Production Control and Chemical Injection Systems
Description
This document addresses the avoidance of blockages in subsea production control and chemical injection systems (CISs). It includes requirements and gives recommendations for the design and operation of subsea production systems (SPSs) with the aim of preventing blockages in control and production chemical fluid (PCF) conduits and associated connectors/fittings. In the context of design, this covers not only installed subsea hardware (trees, manifolds, etc.), the connecting linkages (jumper arrangements, umbilical systems, etc.), but the fluids to be conveyed, initially from the fluid manufacturers’ facilities through to bunkering at the host facility and, ultimately, injection or usage at remote subsea locations. The document also addresses the issues of topside equipment which provides the control and chemical injection (CI) services necessary for the operation and performance of a SPS.
Edition
1
Published Date
2012-03-14
Status
Current
Pages
54
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This document addresses the avoidance of blockages in subsea production control and chemical injection systems (CISs). It includes requirements and gives recommendations for the design and operation of subsea production systems (SPSs) with the aim of preventing blockages in control and production chemical fluid (PCF) conduits and associated connectors/fittings. In the context of design, this covers not only installed subsea hardware (trees, manifolds, etc.), the connecting linkages (jumper arrangements, umbilical systems, etc.), but the fluids to be conveyed, initially from the fluid manufacturers’ facilities through to bunkering at the host facility and, ultimately, injection or usage at remote subsea locations. The document also addresses the issues of topside equipment which provides the control and chemical injection (CI) services necessary for the operation and performance of a SPS.








