Search
×
FR

Placeholder headline

This is just a placeholder headline

API MPMS CH 10.8, 3rd Edition: Standard Test Method for Sediment in Crude Oil by Membrane Filtration

$

114

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

API TR 17TR5

API TR 17TR5, 1st Edition: Avoidance of Blockages in Subsea Production Control and Chemical Injection Systems

CDN $211.00

Avoidance of Blockages in Subsea Production Control and Chemical Injection Systems

SKU: 21e38fa1e2a4 Category:

Description

This document addresses the avoidance of blockages in subsea production control and chemical injection systems (CISs). It includes requirements and gives recommendations for the design and operation of subsea production systems (SPSs) with the aim of preventing blockages in control and production chemical fluid (PCF) conduits and associated connectors/fittings. In the context of design, this covers not only installed subsea hardware (trees, manifolds, etc.), the connecting linkages (jumper arrangements, umbilical systems, etc.), but the fluids to be conveyed, initially from the fluid manufacturers’ facilities through to bunkering at the host facility and, ultimately, injection or usage at remote subsea locations. The document also addresses the issues of topside equipment which provides the control and chemical injection (CI) services necessary for the operation and performance of a SPS.

Edition

1

Published Date

2012-03-14

Status

Current

Pages

54

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document addresses the avoidance of blockages in subsea production control and chemical injection systems (CISs). It includes requirements and gives recommendations for the design and operation of subsea production systems (SPSs) with the aim of preventing blockages in control and production chemical fluid (PCF) conduits and associated connectors/fittings. In the context of design, this covers not only installed subsea hardware (trees, manifolds, etc.), the connecting linkages (jumper arrangements, umbilical systems, etc.), but the fluids to be conveyed, initially from the fluid manufacturers’ facilities through to bunkering at the host facility and, ultimately, injection or usage at remote subsea locations. The document also addresses the issues of topside equipment which provides the control and chemical injection (CI) services necessary for the operation and performance of a SPS.

Previous Editions

Can’t find what you are looking for?

Please contact us at: