Your cart is currently empty!

APR TR 2WSIM
API TR 2WSIM: Weathervaning System Integrity Management
CDN $227.00
This publication was last reviewed and confirmed in 2025.
Category: Exploration and Production
Description
The document provides guidance on managing the integrity of FPS and loading/unloading buoy weathervaning systems. This includes load and transfer subsystems and their interfaces with hull structures, platform tower structures, risers, umbilicals, and moorings.
Edition
1
Published Date
2025-10-22
Status
Current
Pages
105
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
The document provides guidance on managing the integrity of FPS and loading/unloading buoy weathervaning systems. This includes load and transfer subsystems and their interfaces with hull structures, platform tower structures, risers, umbilicals, and moorings.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API RP 100-1: Hydraulic Fracturing — Well Integrity and Fracture Containment
CDN $176.97 Add to cart -

API RP 10B-5: Recommended Practice on Determination of Shrinkage and Expansion of Well Cement Formul
CDN $156.93 Add to cart -

API RP 10B-4: Preparation and Testing of Foamed Cement Slurries at Atmospheric Pressure
CDN $185.31 Add to cart -

API RP 10G: Product Evaluation, Application, and Testing of Stage Cementing Collars
CDN $250.43 Add to cart







