
APR TR 2WSIM
API TR 2WSIM, 1st Edition: Weathervaning System Integrity Management
CDN $257.00
This publication was last reviewed and confirmed in 2025.
API TR 2WSIM: Weathervaning System Integrity Management
SKU: 64b22a989192
Category: Exploration and Production
Description
The document provides guidance on managing the integrity of FPS and loading/unloading buoy weathervaning systems. This includes load and transfer subsystems and their interfaces with hull structures, platform tower structures, risers, umbilicals, and moorings.
Edition
1
Published Date
2025-10-22
Status
Current
Pages
105
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
The document provides guidance on managing the integrity of FPS and loading/unloading buoy weathervaning systems. This includes load and transfer subsystems and their interfaces with hull structures, platform tower structures, risers, umbilicals, and moorings.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API SPEC 10F: Errata
CDN $0.00 Add to cart -

API RP 10B-5, 1st Edition: Recommended Practice on Determination of Shrinkage and Expansion of Well Cement Formul
CDN $175.00 Add to cart -

API TR 10TR4, 1st Edition: Technnical Report on Considerations Regarding Selection of Centralizers for Primary Ce
CDN $136.00 Add to cart -

API RP 10B-3, 2nd Edition: Testing of Well Cements Used in Deepwater Well Construction
CDN $207.00 Add to cart







