Search
×
FR

Placeholder headline

This is just a placeholder headline

ISO 12480-5:2026 Cranes — Safe use — Part 5: Bridge and gantry cranes

$

77

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME.BPVC.II.D.C-2025:Section II, Materials, Part D, Properties

$

1030

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME BPVC.II.B-2025: Section II, Materials, Part B, Nonferrous Material Specifications

$

1545

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME BPVC II.D.M-2025: Section II, Materials, Part D, Properties

$

1545

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME BPVC.II.A-2025: BPVC Section II-Materials-Part A-Ferrous Materials Specifications

$

1545

BUY NOW

ASME BPVC.CC.NC.XI

ASME BPVC.CC.NC.XI-2023: Code Cases: Nuclear Components–Section XI: Rules for Inservice Inspection of Nuclear Power Plant Components

CDN $675.00

This publication was last reviewed and confirmed in 2023.

Category:

Description

Provides the latest code cases for Section XI, Rules for Inservice Inspection of Nuclear Components. These approved alternative are designed to maintain the nuclear power plant and to return the plant to service following plant outages. In addition, they may cover the duties of the Authorized Nuclear Inservice Inspector to verify that the program has been completed, permitting the plant to return to service in a safe and expeditious manner. When fully and correctly implemented, the requirements found within this book help Code users achieve continued quality and safety. While the Code Cases found here are not mandatory, they are used extensively by those directly responsible for operating, maintaining and inspecting nuclear power plants.

Edition

2023

Published Date

2026-06-13

Status

Current

Pages

871

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

Provides the latest code cases for Section XI, Rules for Inservice Inspection of Nuclear Components. These approved alternative are designed to maintain the nuclear power plant and to return the plant to service following plant outages. In addition, they may cover the duties of the Authorized Nuclear Inservice Inspector to verify that the program has been completed, permitting the plant to return to service in a safe and expeditious manner. When fully and correctly implemented, the requirements found within this book help Code users achieve continued quality and safety. While the Code Cases found here are not mandatory, they are used extensively by those directly responsible for operating, maintaining and inspecting nuclear power plants.

Previous Editions

Can’t find what you are looking for?

Please contact us at: