
ASME BPVC.XI.1
BPVC.XI.1-2025: Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components,Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components
CDN $1,678.00
This publication was last reviewed and confirmed in 2025.
Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components,Division 1, Rules for Inservice Inspection of Nuclear Power Plant Components
Description
Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 1 This Division provides rules for the examination, inspection, and testing; NDE methods, qualifications, and requirements; evaluation and acceptance standards for flaws, defects, and relevant conditions; repair/replacement processes and correction actions/measures in light water cooled nuclear power plants. Careful application of this Section will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benefits to be gained from the many industry best-practices detailed within these volumes.
Edition
2025
Published Date
2026-07-28
Status
Current
Pages
797
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 1 This Division provides rules for the examination, inspection, and testing; NDE methods, qualifications, and requirements; evaluation and acceptance standards for flaws, defects, and relevant conditions; repair/replacement processes and correction actions/measures in light water cooled nuclear power plants. Careful application of this Section will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benefits to be gained from the many industry best-practices detailed within these volumes.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

BPVC.III.5-2025: Section III, Rules for Construction of Nuclear Facility Components, Division 5, High Temperature Reactors
CDN $1,321.00 Add to cart -

BPVC.III.A-2025: Section III, Rules for Construction of Nuclear Facility Components, Appendices
CDN $1,400.00 Add to cart -

BPVC.XI.2-2025: Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities
CDN $1,456.00 Add to cart -

BPVC.III.2-2023: Section III, Rules for Construction of Nuclear Facility Components, Division 2, Code for Concrete Containments (Previous Edition)
CDN $1,177.00 Add to cart







