ASME BPVC.XI.2
BPVC.XI.2-2025: Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities
CDN $1,456.00
This publication was last reviewed and confirmed in 2025.
Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities
Description
Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 2 This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.
Edition
2025
Published Date
2026-07-28
Status
Current
Pages
177
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 2 This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

BPVC.III.1.NB-2023: Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NB, Class 1 Components (Previous Edition)
CDN $1,122.00 Add to cart -

BPVC.III.1.NB-2025: Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NB, Class 1 Components
CDN $1,257.00 Add to cart -

BPVC.III.3-2025: Section III, Rules for Construction of Nuclear Facility Components, Division 3, Containment Systems for Transportation and Storage of Spent Nuclear Fuel and High-Level Radioactive Material
CDN $1,321.00 Add to cart -

BPVC.III.1.NF-2025: Section III, Rules for Construction of Nuclear Facility Components, Division 1, Subsection NF, Supports
CDN $1,154.00 Add to cart