Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

CSA A123.21:26 – Standard test method for the dynamic wind uplift resistance of membrane-roofing systems

$

236

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-A123.2-03 (R2023) – Asphalt-coated roofing sheets

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

A123.23-15 (R2025) – Product specification for polymer-modified bitumen sheet, prefabricated and reinforced

$

118

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.24:21 (R2026) – Standard test method for wind resistance of vegetated roof assembly

$

161

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.25:18 (R2023) – Asphalt core boards used in roofing

$

197

BUY NOW

Placeholder headline

This is just a placeholder headline

A123.3-05 (R2020) – Asphalt saturated organic roofing felt

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-A123.4-04 (R2023) – Asphalt for constructing built-up roof coverings and waterproofing systems

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.5:16 (R2020) – Asphalt shingles made from glass felt and surfaced with mineral granules

$

197

BUY NOW

CSA N290.11:21

CSA N290.11:21 – Requirements for reactor heat removal capability during outage of nuclear power plants

CDN $1,086.00

Requirements for reactor heat removal capability during outage of nuclear power plants

SKU: 2429147 Categories: ,

Description

Preface This is the second edition of CSA N290.11, Requirements for reactor heat removal capability during outage of nuclear power plants . It supersedes the previous edition published in 2013. The following are the major changes to this edition: a) updated requirements and specifications for the back-up heat sink and the protection it is to provide; b) provided additional clarification in areas identified by users; and c) improved alignment with current industry standards. The CSA N-Series of Standards provides an interlinked set of requirements for the management of nuclear facilities and activities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while the other CSA nuclear Standards provide technical requirements and guidance that support the management system. This Standard works in harmony with CSA N286 and does not duplicate the generic requirements of CSA N286; however, it can provide more specific direction for those requirements. This Standard reflects the operating experience of the Canadian nuclear power industry. Users of this Standard are reminded that the design, manufacture, construction, commissioning, operation, and decommissioning of nuclear facilities in Canada are subject to the provisions of the Nuclear Safety and Control Act and its supporting Regulations. Scope 1.1 This Standard covers the design, qualification, installation, commissioning, operation, maintenance, testing, inspection, and documentation requirements for systems providing heat removal from the reactor core to the ultimate heat sink(s) for water-cooled nuclear power plants during outages. 1.2 This Standard covers only fuel cooling within the reactor core and does not cover spent fuel pool cooling, off-reactor fuelling operations, or the completely defueled core state. 1.3 This Standard covers all systems that contribute to the transfer of heat by a) conveying heat to the ultimate heat sink; b) providing power or compressed air; c) providing inventory makeup to heat sink systems; or d) monitoring and control. Note: The combination of systems or portions of systems that contribute to these functions are referred to in this Standard as “heat sinks”. 1.4 The term “outage” refers to the following reactor states: a) a shutdown state where subcriticality is assured by physical means; or Note: For CANDU reactors, this refers to a guaranteed shutdown state. b) critical or sub-critical at any power where the normal (at high power) heat sinks are not the primary heat sinks. Note: Examples of high power heat sinks include steaming of boilers to turbine or condensers. 1.5 This Standard does not cover requirements for design extension conditions (DEC). Requirements and principles for maintaining fuel cooling for outages during DECs, including requirements for emergency cooling water and power supplies, are covered in CSA N290.16. 1.6 For the purposes of this Standard, the outage commences when the normal (at high power) heat sinks are no longer the primary heat sinks. The outage is considered to be terminated when the normal (at high power) heat sinks are reestablished as part of the plan to proceed to sustained high power operation. 1.7 In this Standard, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

Edition

Not found

Published Date

2026-10-05

Status

Not found

Pages

28

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

Preface This is the second edition of CSA N290.11, Requirements for reactor heat removal capability during outage of nuclear power plants . It supersedes the previous edition published in 2013. The following are the major changes to this edition: a) updated requirements and specifications for the back-up heat sink and the protection it is to provide; b) provided additional clarification in areas identified by users; and c) improved alignment with current industry standards. The CSA N-Series of Standards provides an interlinked set of requirements for the management of nuclear facilities and activities. CSA N286 provides overall direction to management to develop and implement sound management practices and controls, while the other CSA nuclear Standards provide technical requirements and guidance that support the management system. This Standard works in harmony with CSA N286 and does not duplicate the generic requirements of CSA N286; however, it can provide more specific direction for those requirements. This Standard reflects the operating experience of the Canadian nuclear power industry. Users of this Standard are reminded that the design, manufacture, construction, commissioning, operation, and decommissioning of nuclear facilities in Canada are subject to the provisions of the Nuclear Safety and Control Act and its supporting Regulations. Scope 1.1 This Standard covers the design, qualification, installation, commissioning, operation, maintenance, testing, inspection, and documentation requirements for systems providing heat removal from the reactor core to the ultimate heat sink(s) for water-cooled nuclear power plants during outages. 1.2 This Standard covers only fuel cooling within the reactor core and does not cover spent fuel pool cooling, off-reactor fuelling operations, or the completely defueled core state. 1.3 This Standard covers all systems that contribute to the transfer of heat by a) conveying heat to the ultimate heat sink; b) providing power or compressed air; c) providing inventory makeup to heat sink systems; or d) monitoring and control. Note: The combination of systems or portions of systems that contribute to these functions are referred to in this Standard as "heat sinks". 1.4 The term "outage" refers to the following reactor states: a) a shutdown state where subcriticality is assured by physical means; or Note: For CANDU reactors, this refers to a guaranteed shutdown state. b) critical or sub-critical at any power where the normal (at high power) heat sinks are not the primary heat sinks. Note: Examples of high power heat sinks include steaming of boilers to turbine or condensers. 1.5 This Standard does not cover requirements for design extension conditions (DEC). Requirements and principles for maintaining fuel cooling for outages during DECs, including requirements for emergency cooling water and power supplies, are covered in CSA N290.16. 1.6 For the purposes of this Standard, the outage commences when the normal (at high power) heat sinks are no longer the primary heat sinks. The outage is considered to be terminated when the normal (at high power) heat sinks are reestablished as part of the plan to proceed to sustained high power operation. 1.7 In this Standard, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.

Previous Editions

Can’t find what you are looking for?

Please contact us at: