Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

B51-14 (R2019) – Boiler, pressure vessel, and pressure piping code

$

362

BUY NOW

CSA TS-804.2:25

CSA TS-804.2:25 – Electric vehicle infrastructure uptime guidance — Reporting

CDN $79.00

Electric vehicle infrastructure uptime guidance — Reporting

SKU: 2431874 Categories: ,

Description

Preface This is the first edition of CSA TS-804.2, Electric vehicle infrastructure uptime guidance — Reporting. This Technical Specification (referred to as “this Document” from here on) is not a consensus product; that is, it is not a Standard and it has not been formally reviewed or approved by a CSA Technical Committee. This Document contains reporting guidance for uptime during operation. It is intended to be used with CSA TS-804.1, which explains the overview and background of uptime. CSA Group acknowledges that the development of this Document was made possible, in part, by the financial support of Natural Resources Canada. This Document was prepared by the EV Infrastructure Reliability Working Group. Scope 1.1 Inclusions This Document, which provides the uptime data reporting parameters, applies to all electric vehicle chargers installed in public places. 1.2 Terminology This Document contains no requirements. In this Document, “should” is used to express a recommendation or that which is advised but not required, and “may” is used to express an option or that which is permissible within the limits of the Document.

Edition

Not found

Published Date

2026-10-05

Status

Not found

Pages

11

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

Preface This is the first edition of CSA TS-804.2, Electric vehicle infrastructure uptime guidance — Reporting. This Technical Specification (referred to as "this Document" from here on) is not a consensus product; that is, it is not a Standard and it has not been formally reviewed or approved by a CSA Technical Committee. This Document contains reporting guidance for uptime during operation. It is intended to be used with CSA TS-804.1, which explains the overview and background of uptime. CSA Group acknowledges that the development of this Document was made possible, in part, by the financial support of Natural Resources Canada. This Document was prepared by the EV Infrastructure Reliability Working Group. Scope 1.1 Inclusions This Document, which provides the uptime data reporting parameters, applies to all electric vehicle chargers installed in public places. 1.2 Terminology This Document contains no requirements. In this Document, "should" is used to express a recommendation or that which is advised but not required, and "may" is used to express an option or that which is permissible within the limits of the Document.

Previous Editions

Can’t find what you are looking for?

Please contact us at: