Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

B51-14 (R2019) – Boiler, pressure vessel, and pressure piping code

$

362

BUY NOW

ISO 10903:2025

ISO 10903:2025 Oil and gas industries including lower carbon energy — Pipeline transportation systems — Pipeline geohazard monitoring processes, systems and technologies

CDN $391.00

This publication was last reviewed and confirmed in 2025.

Oil and gas industries including lower carbon energy — Pipeline transportation systems — Pipeline geohazard monitoring processes, systems and technologies

SKU: eeaf66b930b0 Categories: ,

Description

This document provides requirements and guidance on planning, selecting, and implementing methods and strategies for monitoring geohazards that can interact with pipelines.

This document specifies requirements and recommendations for users regarding the development and initiation of monitoring processes throughout the pipeline life cycle, including the following stages:

a)       preliminary engineering and route selection phase;

b)       detailed design phase;

c)        construction phase;

d)       operation and maintenance phase.

This document also describes the processes and steps for developing a suitable geohazard monitoring program (GHMP).

This document applies to geohazard monitoring of new and existing onshore gathering and transportation pipelines and the right-of-way (RoW).

This document does not apply to monitoring geohazards that are temporary, such as the stability of spoil piles, temporary cut slopes to facilitate pipeline construction, stability of excavation or trench wall, and access roads.

Edition

1

Published Date

2026-06-18

Status

PUBLISHED

Pages

69

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides requirements and guidance on planning, selecting, and implementing methods and strategies for monitoring geohazards that can interact with pipelines.

This document specifies requirements and recommendations for users regarding the development and initiation of monitoring processes throughout the pipeline life cycle, including the following stages:

a)       preliminary engineering and route selection phase;

b)       detailed design phase;

c)        construction phase;

d)       operation and maintenance phase.

This document also describes the processes and steps for developing a suitable geohazard monitoring program (GHMP).

This document applies to geohazard monitoring of new and existing onshore gathering and transportation pipelines and the right-of-way (RoW).

This document does not apply to monitoring geohazards that are temporary, such as the stability of spoil piles, temporary cut slopes to facilitate pipeline construction, stability of excavation or trench wall, and access roads.

Previous Editions

Can’t find what you are looking for?

Please contact us at: