
ISO 24359-1:2026
ISO 24359-1:2026 Building commissioning process planning — Part 1: New buildings
CDN $296.00
This publication was last reviewed and confirmed in 2026.
Building commissioning process planning — Part 1: New buildings
Description
This document addresses the development of a building commissioning (Cx) plan for new construction, major renovations, or system and assembly replacement projects. The commissioning plan incorporates commissioning activities which begin during early project stages, and continue through pre-design, design, construction, turnover and the first year of operation. The commissioning plan is developed during the design stage and also address later stages of the project.
The commissioning plan presents the intended process to verify and document that the quality of the built project in operation meets the requirements of the owner. This document provides an overarching process for the planning of commissioning any aspect of a building project and is intended for use with system or discipline specific standards. This document does not include retro-commissioning or recommissioning in existing buildings.
Edition
1
Published Date
2026-06-19
Status
PUBLISHED
Pages
27
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This document addresses the development of a building commissioning (Cx) plan for new construction, major renovations, or system and assembly replacement projects. The commissioning plan incorporates commissioning activities which begin during early project stages, and continue through pre-design, design, construction, turnover and the first year of operation. The commissioning plan is developed during the design stage and also address later stages of the project.
The commissioning plan presents the intended process to verify and document that the quality of the built project in operation meets the requirements of the owner. This document provides an overarching process for the planning of commissioning any aspect of a building project and is intended for use with system or discipline specific standards. This document does not include retro-commissioning or recommissioning in existing buildings.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

ISO 4378:2024 Plain bearings – Terms, definitions, classification and symbols – Part 3: Lubrication
CDN $193.00 Add to cart -

ISO 16840:2006 Wheelchair seating – Part 1: Vocabulary, reference axis convention and measures for body segments, posture and postural support surfaces
CDN $391.00 Add to cart -

ISO 2382:2015 Information technology – Vocabulary
CDN $0.00 Add to cart -

ISO 13943:2023 Fire safety – Vocabulary
CDN $391.00 Add to cart







