Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

B51-14 (R2019) – Boiler, pressure vessel, and pressure piping code

$

362

BUY NOW

ISO 24675-2:2026

ISO 24675-2:2026 Railway applications — Running time calculation for timetabling — Part 2: Distance-speed diagrams and speed curves

CDN $261.00

This publication was last reviewed and confirmed in 2026.

Railway applications — Running time calculation for timetabling — Part 2: Distance-speed diagrams and speed curves

Description

This document specifies a practical procedure to create and verify distance-speed diagrams and speed curves using the parameters specified in ISO 24675-1, from which the shortest running time for railway timetabling is obtained by numerically integrating the speed curves.

This document excludes running time calculation used for purposes other than timetabling.

Edition

1

Published Date

2026-06-19

Status

PUBLISHED

Pages

23

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document specifies a practical procedure to create and verify distance-speed diagrams and speed curves using the parameters specified in ISO 24675-1, from which the shortest running time for railway timetabling is obtained by numerically integrating the speed curves.

This document excludes running time calculation used for purposes other than timetabling.

Previous Editions

Can’t find what you are looking for?

Please contact us at: