Search
×
FR

Placeholder headline

This is just a placeholder headline

ISO 22002-2:2025 Prerequisite programmes on food safety — Part 2: Catering

$

125

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/IEC 30186:2025 Digital twin — Maturity model and guidance for a maturity assessment

$

296

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 28079:2026 Hardmetals — Palmqvist toughness test

$

125

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 8458-3:2026 Steel wire for mechanical springs — Part 3: Oil-hardened and tempered wire

$

125

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO/TR 25088:2026 Guidance for the application of low-carbon technologies in steel plants

$

251

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 8458-2:2026 Steel wire for mechanical springs — Part 2: Patented cold-drawn non-alloy steel wire

$

125

BUY NOW

ISO/IEC/IEEE 24748-4:2026

ISO/IEC/IEEE 24748-4:2026 Systems and software engineering — Life cycle management — Part 4: Systems engineering management planning

CDN $380.00

This publication was last reviewed and confirmed in 2026.

Systems and software engineering — Life cycle management — Part 4: Systems engineering management planning

Description

This document:

  • provides an expanded view of the processes from ISO/IEC/IEEE 15288 that implement systems engineering (SE) management for the life cycles of technical solutions;
  • describes a required information item, termed the systems engineering management plan (SEMP) for the technical management and execution of the SE of technical solutions,
  • provides requirements and guidance for the content of the required information item.

This document is applicable to:

  • those who use or plan to use ISO/IEC/IEEE 15288 on projects dealing with human-made systems, products and services;
  • those who are responsible for the technical management of projects concerned with the engineering of systems;
  • those responsible for planning or executing ISO/IEC/IEEE 15288 system life cycle processes at a project level;
  • organizations and individuals involved with a technical project management effort;
  • anyone developing engineering management documentation to complete technical planning aspects of their project’s processes.

This document is intended to provide guidance for two-party situations and can be equally applied where the two parties are from the same organization. This document can also be used by a single party as self-imposed tasks.

This document can also serve as guidance in multi-party situations, where high risks are inherent in the supply and integration of complex systems, and procurement can involve several suppliers, organizations or parties.

Edition

2

Published Date

2026-06-18

Status

PUBLISHED

Pages

51

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document:

  • provides an expanded view of the processes from ISO/IEC/IEEE 15288 that implement systems engineering (SE) management for the life cycles of technical solutions;
  • describes a required information item, termed the systems engineering management plan (SEMP) for the technical management and execution of the SE of technical solutions,
  • provides requirements and guidance for the content of the required information item.

This document is applicable to:

  • those who use or plan to use ISO/IEC/IEEE 15288 on projects dealing with human-made systems, products and services;
  • those who are responsible for the technical management of projects concerned with the engineering of systems;
  • those responsible for planning or executing ISO/IEC/IEEE 15288 system life cycle processes at a project level;
  • organizations and individuals involved with a technical project management effort;
  • anyone developing engineering management documentation to complete technical planning aspects of their project’s processes.

This document is intended to provide guidance for two-party situations and can be equally applied where the two parties are from the same organization. This document can also be used by a single party as self-imposed tasks.

This document can also serve as guidance in multi-party situations, where high risks are inherent in the supply and integration of complex systems, and procurement can involve several suppliers, organizations or parties.

Previous Editions

Can’t find what you are looking for?

Please contact us at: