Search
×
FR

Placeholder headline

This is just a placeholder headline

BPVC.II.B-2023: Section II, Materials, Part B, Nonferrous Material Specifications (Previous Edition)

$

1464

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.II.D.C-2023: Section II, Materials, Part D, Properties (Customary) (Previous Edition)

$

1464

BUY NOW

Placeholder headline

This is just a placeholder headline

ASME BPVC-CC-NC-2013: BPVC Code Cases- Nuclear Components

$

115

BUY NOW

Placeholder headline

This is just a placeholder headline

BPVC.II.D.M-2023: Section II, Materials, Part D, Properties (Metric) (Previous Edition)

$

1464

BUY NOW

BPVC.XI.2-2023

BPVC.XI.2-2023: Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities (Previous Edition)

CDN $1,305.00

Section XI, Rules for Inservice Inspection of Nuclear Reactor Facility Components, Division 2, Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities

SKU: 400112 Category:

Description

Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 2 This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.

Edition

Not found

Published Date

2026-07-28

Status

Previous Edition

Pages

151

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

Provides requirements to maintain the nuclear power plant while in operation and to return the plant to service following plant outages. The rules require a mandatory program to evidence adequate safety and manage deterioration and aging effects. The rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the mandatory program has been completed, permitting the plant to return to service in a safe and expeditious manner. Application of this Section begins when the requirements of the construction code have been satisfied. DIVISION 2 This Division provides the requirements for the creation of the Reliability and Integrity Management (RIM) Program for advanced nuclear reactor designs. The RIM Program addresses the entire life cycle for all types of nuclear power plants, it requires a combination of monitoring, examination, tests, operation, and maintenance requirements that ensures each Structure, System, and Component (SSC) meets plant risk and reliability goals that are selected for the RIM Program.

Previous Editions

Can’t find what you are looking for?

Please contact us at: