Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

B51-14 (R2019) – Boiler, pressure vessel, and pressure piping code

$

362

BUY NOW

CAN/CSA-C61000-3-13-09 (R2022)

CAN/CSA-C61000-3-13-09 (R2022) – Electromagnetic compatibility (EMC) – Part 3-13: Limits – Assessment of emission limits for the connection of unbalanced installations to MV, HV and EHV power systems (Adopted IEC/TR 61000-3-13:2008, first edition, 2008-02, with Canadian deviations)

CDN $409.00

Electromagnetic compatibility (EMC) – Part 3-13: Limits – Assessment of emission limits for the connection of unbalanced installations to MV, HV and EHV power systems (Adopted IEC/TR 61000-3-13:2008, first edition, 2008-02, with Canadian deviations)

Description

CSA Preface This is the first edition of CAN/CSA-C61000-3-13, Electromagnetic compatibility (EMC) — Part 3-13: Limits — Assessment of emission limits for the connection of unbalanced installations to MV, HV and EHV power systems , which is an adoption, with Canadian deviations, of the identically titled IEC (International Electrotechnical Commission) Technical Report 61000-3-13 (first edition, 2008-02), including IEC Corrigendum 1:2010. For brevity, this Standard will be referred to as “CAN/CSA-C61000-3-13” throughout. The primary objective of this adopted Technical Report is to provide guidance for engineering practices. It is intended to be informative and should not be considered normative. This Technical Report was reviewed for Canadian adoption by the CSA Subcommittee on Low-Frequency Electromagnetic Compatibility, under the jurisdiction of the CSA Technical Committee on Electromagnetic Compatibility and the CSA Strategic Steering Committee on Power Engineering and Electromagnetic Compatibility, and has been formally approved by the Technical Committee. This Standard has been developed in compliance with Standards Council of Canada requirements for National Standards of Canada. It has been published as a National Standard of Canada by CSA Group. Scope This part of IEC 61000 provides guidance on principles which can be used as the basis for determining the requirements for the connection of unbalanced installations (i.e. three-phase installations causing voltage unbalance) to MV, HV and EHV public power systems (LV installations are covered in other IEC documents). For the purposes of this report, an unbalanced installation means a three-phase installation (which may be a load or a generator) that produces voltage unbalance on the system. The connection of single-phase installations is not specifically addressed, as the connection of such installations is under the control of the system operator or owner. The general principles however may be adapted when considering the connection of single-phase installations. The primary objective is to provide guidance to system operators or owners on engineering practices, which will facilitate the provision of adequate service quality for all connected customers. In addressing installations, this document is not intended to replace equipment standards for emission limits. The report addresses the allocation of the capacity of the system to absorb disturbances. It does not address how to mitigate disturbances, nor does it address how the capacity of the system can be increased. Since the guidelines outlined in this report are necessarily based on certain simplifying assumptions, there is no guarantee that this approach will always provide the optimum solution for all unbalanced load situations. The recommended approach should be used with flexibility and judgment as far as engineering is concerned, when applying the given assessment procedures in full or in part. The system operator or owner is responsible for specifying requirements for the connection of installations which may cause unbalance on the system. The disturbing installation is to be understood as the complete customer’s installation (i.e. including balanced and unbalanced parts).

Edition

Not found

Published Date

2026-10-05

Status

Not found

Pages

58

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

CSA Preface This is the first edition of CAN/CSA-C61000-3-13, Electromagnetic compatibility (EMC) — Part 3-13: Limits — Assessment of emission limits for the connection of unbalanced installations to MV, HV and EHV power systems , which is an adoption, with Canadian deviations, of the identically titled IEC (International Electrotechnical Commission) Technical Report 61000-3-13 (first edition, 2008-02), including IEC Corrigendum 1:2010. For brevity, this Standard will be referred to as “CAN/CSA-C61000-3-13” throughout. The primary objective of this adopted Technical Report is to provide guidance for engineering practices. It is intended to be informative and should not be considered normative. This Technical Report was reviewed for Canadian adoption by the CSA Subcommittee on Low-Frequency Electromagnetic Compatibility, under the jurisdiction of the CSA Technical Committee on Electromagnetic Compatibility and the CSA Strategic Steering Committee on Power Engineering and Electromagnetic Compatibility, and has been formally approved by the Technical Committee. This Standard has been developed in compliance with Standards Council of Canada requirements for National Standards of Canada. It has been published as a National Standard of Canada by CSA Group. Scope This part of IEC 61000 provides guidance on principles which can be used as the basis for determining the requirements for the connection of unbalanced installations (i.e. three-phase installations causing voltage unbalance) to MV, HV and EHV public power systems (LV installations are covered in other IEC documents). For the purposes of this report, an unbalanced installation means a three-phase installation (which may be a load or a generator) that produces voltage unbalance on the system. The connection of single-phase installations is not specifically addressed, as the connection of such installations is under the control of the system operator or owner. The general principles however may be adapted when considering the connection of single-phase installations. The primary objective is to provide guidance to system operators or owners on engineering practices, which will facilitate the provision of adequate service quality for all connected customers. In addressing installations, this document is not intended to replace equipment standards for emission limits. The report addresses the allocation of the capacity of the system to absorb disturbances. It does not address how to mitigate disturbances, nor does it address how the capacity of the system can be increased. Since the guidelines outlined in this report are necessarily based on certain simplifying assumptions, there is no guarantee that this approach will always provide the optimum solution for all unbalanced load situations. The recommended approach should be used with flexibility and judgment as far as engineering is concerned, when applying the given assessment procedures in full or in part. The system operator or owner is responsible for specifying requirements for the connection of installations which may cause unbalance on the system. The disturbing installation is to be understood as the complete customer's installation (i.e. including balanced and unbalanced parts).

Previous Editions

Can’t find what you are looking for?

Please contact us at: