
CSA C22.3 NO. 6:13 (R2022)
CSA C22.3 NO. 6:13 (R2022) – Principles and practices of electrical coordination between pipelines and electric supply lines
CDN $284.00
Principles and practices of electrical coordination between pipelines and electric supply lines
Description
Preface This is the third edition of CSA C22.3 No. 6, Principles and practices of electrical coordination between pipelines and electric supply lines, one of a series of Standards issued by CSA Group under the Canadian Electrical Code, Part III. It supersedes the previous editions, published in 1991 and 1987. The first edition of this Standard was the result of work done by a task force organized by the committees on the gas and oil pipeline codes in order to consider the effects of electric power lines on pipelines. In addition to a general update, the following key revisions have been made in this edition of CSA C22.3 No. 6: a) clarification that the Standard applies to transmission supply lines; b) guidance and an informative annex on ac corrosion on pipelines; c) guidance and an informative annex on underground transmission cables; d) an annex, with examples, discussing the sensitivity of induction to various parameters; e) updated criteria and an informative annex related to the use of gradient control mats; and f) updated requirements for the reduction of adverse effects during power line fault conditions. This Standard was prepared by the Subcommittee on Electrical Coordination between Pipelines and Electric Supply Lines, under the jurisdiction of the Technical Committee on Overhead Systems and the Strategic Steering Committee on Power Engineering and Electromagnetic Compatibility, and has been formally approved by the Technical Committee. This Standard has been developed in compliance with Standards Council of Canada requirements for National Standards of Canada. It has been published as a National Standard of Canada by CSA Group. Scope 1.1 This Standard sets forth methods of electrical coordination between pipelines and alternating current (ac) supply lines* having line-to-line voltages greater than 60 kV that are simultaneously or separately installed as follows: a) a pipeline located on a power line right-of-way or a power line located on a pipeline right-of-way; b) a pipeline right-of-way located parallel to a power line right-of-way, or vice versa, where the adjacent right-of-way boundaries are within 300 m of each other; and c) laterals and extensions to the pipelines described in Item (a) or (b). * Referred to in this Standard as power lines. Notes: 1) Power lines operating at voltages lower than 60 kV can, in some situations, induce significant voltages on parallel pipelines. 2) The contribution of the third harmonic to induction on pipelines has been observed in some situations. Industry understanding of the impact on pipeline induction from harmonics on the electric transmission system is not mature at this time; material on the subject will be considered in a future update to this Standard. 3) Induction on pipelines is influenced by factors in addition to the distance between parallel power lines and pipelines, e.g., the length of the parallelism and the power line current. Based on engineering analysis, it can be necessary for the parties involved to apply the principles and practices outlined in this Standard in situations where parallel rights-of-way are separated by more than the distance specified in Clause 1.1(b), e.g., in cases of parallels longer than 5 km. 1.2 This Standard describes mutual interference effects between pipelines and power lines and provides guidelines that, when used in the design, construction, operation, and maintenance of either facility, will reduce these effects. 1.3 This Standard recommends acceptable interference levels and minimum required separation between facilities. 1.4 The requirements of this Standard may also be applied to piping in refineries, tank farms, compressor and metering stations, and similar facilities. 1.5 This Standard contains requirements supplementary to the requirements of CAN/CSA-Z662, CAN/CSAC22.3 No. 1, and CSA C22.3 No. 4. 1.6 Geomagnetically induced currents (GICs) are not within the scope of this Standard. 1.7 In this Standard, “shall” is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; “should” is used to express a recommendation or that which is advised but not required; and “may” is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.
Edition
Not found
Published Date
2026-10-05
Status
Not found
Pages
63
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
Preface This is the third edition of CSA C22.3 No. 6, Principles and practices of electrical coordination between pipelines and electric supply lines, one of a series of Standards issued by CSA Group under the Canadian Electrical Code, Part III. It supersedes the previous editions, published in 1991 and 1987. The first edition of this Standard was the result of work done by a task force organized by the committees on the gas and oil pipeline codes in order to consider the effects of electric power lines on pipelines. In addition to a general update, the following key revisions have been made in this edition of CSA C22.3 No. 6: a) clarification that the Standard applies to transmission supply lines; b) guidance and an informative annex on ac corrosion on pipelines; c) guidance and an informative annex on underground transmission cables; d) an annex, with examples, discussing the sensitivity of induction to various parameters; e) updated criteria and an informative annex related to the use of gradient control mats; and f) updated requirements for the reduction of adverse effects during power line fault conditions. This Standard was prepared by the Subcommittee on Electrical Coordination between Pipelines and Electric Supply Lines, under the jurisdiction of the Technical Committee on Overhead Systems and the Strategic Steering Committee on Power Engineering and Electromagnetic Compatibility, and has been formally approved by the Technical Committee. This Standard has been developed in compliance with Standards Council of Canada requirements for National Standards of Canada. It has been published as a National Standard of Canada by CSA Group. Scope 1.1 This Standard sets forth methods of electrical coordination between pipelines and alternating current (ac) supply lines* having line-to-line voltages greater than 60 kV that are simultaneously or separately installed as follows: a) a pipeline located on a power line right-of-way or a power line located on a pipeline right-of-way; b) a pipeline right-of-way located parallel to a power line right-of-way, or vice versa, where the adjacent right-of-way boundaries are within 300 m of each other; and c) laterals and extensions to the pipelines described in Item (a) or (b). * Referred to in this Standard as power lines. Notes: 1) Power lines operating at voltages lower than 60 kV can, in some situations, induce significant voltages on parallel pipelines. 2) The contribution of the third harmonic to induction on pipelines has been observed in some situations. Industry understanding of the impact on pipeline induction from harmonics on the electric transmission system is not mature at this time; material on the subject will be considered in a future update to this Standard. 3) Induction on pipelines is influenced by factors in addition to the distance between parallel power lines and pipelines, e.g., the length of the parallelism and the power line current. Based on engineering analysis, it can be necessary for the parties involved to apply the principles and practices outlined in this Standard in situations where parallel rights-of-way are separated by more than the distance specified in Clause 1.1(b), e.g., in cases of parallels longer than 5 km. 1.2 This Standard describes mutual interference effects between pipelines and power lines and provides guidelines that, when used in the design, construction, operation, and maintenance of either facility, will reduce these effects. 1.3 This Standard recommends acceptable interference levels and minimum required separation between facilities. 1.4 The requirements of this Standard may also be applied to piping in refineries, tank farms, compressor and metering stations, and similar facilities. 1.5 This Standard contains requirements supplementary to the requirements of CAN/CSA-Z662, CAN/CSAC22.3 No. 1, and CSA C22.3 No. 4. 1.6 Geomagnetically induced currents (GICs) are not within the scope of this Standard. 1.7 In this Standard, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

CSA E61951-2:21 (R2026) – Secondary cells and batteries containing alkaline or other non-acid electrolytes — Secondary sealed cells and batteries for portable applications — Part 2: Nickel-metal hydride (Adopted IEC 61951-2:2017, fourth edition, 2017-03, with Canadian deviations) | Accumulateurs alcalins et autres accumulateurs à électrolyte non acide — Accumulateurs étanches pour applications portables — Partie 2 : Nickel-métal hydrure (norme IEC 61951-2:2017 adoptée, quatrième édition, 2017-03, avec exigences propres au Canada)
CDN $527.00 Add to cart -

CSA E61558-2-13:25 – Safety of transformers, reactors, power supply units and combinations thereof — Part 2-13: Particular requirements and tests for auto-transformers and power supply units incorporating auto-transformers for general applications (Adopted IEC 61558-2-13:2022, third edition, 2022-10, with Canadian deviations) | Sécurité des transformateurs, bobines d’inductance, blocs d’alimentation et combinaisons de ces éléments — Partie 2-13 : Exigences particulières et essais pour les autotransformateurs et les blocs d’alimentation qui incorporent des autotransformateurs pour applications d’ordre général (norme IEC 61558-2-13:2022 adoptée, troisième édition, 2022-10, avec exigences propres au Canada)
CDN $205.00 Add to cart -

CSA G12:14 (R2024) – Zinc-coated steel wire strand
CDN $136.00 Add to cart -

CSA E61951-1:21 (R2026) – Secondary cells and batteries containing alkaline or other non-acid electrolytes — Secondary sealed cells and batteries for portable applications — Part 1: Nickel-cadmium (Adopted IEC 61951:2017, fourth edition, 2017-03, with Canadian deviations) | Accumulateurs alcalins et autres accumulateurs à électrolyte non acide — Accumulateurs étanches pour applications portables — Partie 1 : Nickel-cadmium (norme IEC 61951-1:2017 adoptée, quatrième édition, 2017-03), avec exigences propres au Canada)
CDN $527.00 Add to cart







