Search
×
FR

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-6 Chapter 6 – Density

$

204

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 560: Fired Heaters for General Refinery Services

$

721

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 64: Diverter Equipment Systems

$

324

BUY NOW

Placeholder headline

This is just a placeholder headline

API MPMS CH 17.10.1: Refrigerated Light Hydrocarbon Fluids – Measurement of Cargoes on Board LNG Carries

$

417

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-1: Testing Water-based Drilling Fluids

$

418

BUY NOW

Placeholder headline

This is just a placeholder headline

API Technical Report TDB-12 Chapter 12 – Thermal Conductivity

$

214

BUY NOW

Placeholder headline

This is just a placeholder headline

API 16FI Frac Iron Guidelines and Requirements

$

129

BUY NOW

ISO 17427:2015

ISO 17427:2015 Intelligent transport systems – Cooperative ITS – Part 6: ‘Core system’ risk assessment methodology

CDN $233.00

Description

The scope of ISO/TR 17427-6:2015 is to identify critical technical and financial risks that can impact the core system deployment supporting C-ITS vehicle and highway systems service provision and to provide means to evaluate such risks.

ISO/TR 17427-6:2015 is designed to embrace C-ITS vehicle and highway systems where there is some institutional involvement and support, by the direct or indirect provision of core system support, and it is the risks associated with the deployment of ?Core Systems’ that provide the focus of this Technical Report.

ISO/TR 17427-6:2015 does not provide a calculated ?global’ risk assessment for C-ITS, but identifies the principal causes of risk, and provides a consistent methodology for a jurisdiction, core system operator, or application service provider, to assess the risks that they face. The objective of this Technical Report is to raise awareness of and consideration of such issues and to give pointers, where appropriate, to standards deliverables existing that provide specifications for all or some of these aspects. This Technical Report does not provide specifications for solutions of these issues.

Edition

1

Published Date

2015-10-22

Status

PUBLISHED

Pages

23

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

The scope of ISO/TR 17427-6:2015 is to identify critical technical and financial risks that can impact the core system deployment supporting C-ITS vehicle and highway systems service provision and to provide means to evaluate such risks.

ISO/TR 17427-6:2015 is designed to embrace C-ITS vehicle and highway systems where there is some institutional involvement and support, by the direct or indirect provision of core system support, and it is the risks associated with the deployment of ?Core Systems' that provide the focus of this Technical Report.

ISO/TR 17427-6:2015 does not provide a calculated ?global' risk assessment for C-ITS, but identifies the principal causes of risk, and provides a consistent methodology for a jurisdiction, core system operator, or application service provider, to assess the risks that they face. The objective of this Technical Report is to raise awareness of and consideration of such issues and to give pointers, where appropriate, to standards deliverables existing that provide specifications for all or some of these aspects. This Technical Report does not provide specifications for solutions of these issues.

Previous Editions

Can’t find what you are looking for?

Please contact us at: