Search
×
FR

Placeholder headline

This is just a placeholder headline

API TR 5C3: Calculating Performance Properties of Pipe Used as Casing or Tubing

$

422

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 671: Special Purpose Couplings for Petroleum, Chemical and Gas Industry Services

$

502

BUY NOW

Placeholder headline

This is just a placeholder headline

Technical Report API TBD-10: Chapter 10 Surface and Interfacial Tension

$

176

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 671: Special Purpose Couplings for Petroleum, Chemical and Gas Industry Services: Errata 2

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

MSS SP-44-2026: Steel Pipeline Flanges

$

450

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 576: Inspection of Pressure-relieving Devices

$

460

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 591: Process Valve Qualification Procedure

$

226

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 576: Inspection of Pressure-relieving Devices: Addendum 1

$

0

BUY NOW

ISO 7:2000

ISO 7:2000 Pipe threads where pressure-tight joints are made on the threads – Part 2: Verification by means of limit gauges

CDN $273.00

SKU: 5c79e1fab2b0 Category:

Description

This part of ISO 7 specifies a process using limit gauges, for the validation of taper internal and external threads

and parallel internal threads on piping systems components and other products, the dimensions and tolerances of

which are detailed in ISO 7-1.

The gauging system described may not be suitable, without special precautions, for gauging of threads on injection

moulded plastic workpieces.

This part of ISO 7 does not cover completely all the requirements necessary for full control of thread quality and

dimensions. Additional control of tools and equipment and visual inspection during production are required to

ensure complete compliance with ISO 7-1, for example the length of useful thread on internally threaded

workpieces should be checked by direct measurement.

Annex A gives a summary of the gauges included in this part of ISO 7, together with details of the thread elements

controlled by each gauge and gauge identification numbers.

In the event of a dispute over compliance with the requirements of ISO 7-1, the gauges in this part of ISO 7 are to

be considered as decisive for the thread elements which they control on the workpiece.

Edition

2

Published Date

2000-09-21

Status

PUBLISHED

Pages

30

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This part of ISO 7 specifies a process using limit gauges, for the validation of taper internal and external threads

and parallel internal threads on piping systems components and other products, the dimensions and tolerances of

which are detailed in ISO 7-1.

The gauging system described may not be suitable, without special precautions, for gauging of threads on injection

moulded plastic workpieces.

This part of ISO 7 does not cover completely all the requirements necessary for full control of thread quality and

dimensions. Additional control of tools and equipment and visual inspection during production are required to

ensure complete compliance with ISO 7-1, for example the length of useful thread on internally threaded

workpieces should be checked by direct measurement.

Annex A gives a summary of the gauges included in this part of ISO 7, together with details of the thread elements

controlled by each gauge and gauge identification numbers.

In the event of a dispute over compliance with the requirements of ISO 7-1, the gauges in this part of ISO 7 are to

be considered as decisive for the thread elements which they control on the workpiece.

Previous Editions

Can’t find what you are looking for?

Please contact us at: