REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API SPEC 7-1: Rotary Drill Stem Elements

$

342

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 7-1: Rotary Drill Stem Elements: Errata 2

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 5267-2:2025 Pulps – Determination of drainability – Part 2: “Canadian Standard” freeness method

$

182

BUY NOW

Placeholder headline

This is just a placeholder headline

MSS SP-106-2025: Cast Copper Alloy Flanges and Flanged Fittings: Class 125, 150, and 300

$

174

BUY NOW

Placeholder headline

This is just a placeholder headline

API 5L8: Field Inspection of New Line Pipe

$

240

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids

$

388

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids: Errata 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 2WSIM: Weathervaning System Integrity Management

$

227

BUY NOW

Placeholder headline

This is just a placeholder headline

API 570: Piping Inspection Code: In service Inspection, Rating, Repair, and Alteration of Piping Systems

$

359

BUY NOW

API RP 100-2

API RP 100-2: Environmental Aspects Associated with Exploration and Production Operations including

CDN $176.97

This publication was last reviewed and confirmed in 2020.

SKU: 3622ca91ad08 Category:

Description

This document provides recommended practices applicable to the planning and operation of wells, and hydraulically fractured wells. Topics covered include recommendations for managing environmental aspects during planning; site selection; logistics; mobilization, rig-up, and demobilization; and stimulation operations. Also, this document includes guidance for managing environmental aspects during well construction; however, guidance for well construction and fracture stimulation design and execution for onshore wells that can be hydraulically fractured are described in API 100-1. This document provides recommendations for the following topics: a) baseline groundwater sampling; b) source water management; c) material selection; d) transportation of materials and equipment; e) storage and management of fluids and chemicals; f) management of solid and liquid wastes; g) air emissions.

Edition

1

Published Date

2015-08-05

Status

Reaffirmed

Pages

62

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides recommended practices applicable to the planning and operation of wells, and hydraulically fractured wells. Topics covered include recommendations for managing environmental aspects during planning; site selection; logistics; mobilization, rig-up, and demobilization; and stimulation operations. Also, this document includes guidance for managing environmental aspects during well construction; however, guidance for well construction and fracture stimulation design and execution for onshore wells that can be hydraulically fractured are described in API 100-1. This document provides recommendations for the following topics: a) baseline groundwater sampling; b) source water management; c) material selection; d) transportation of materials and equipment; e) storage and management of fluids and chemicals; f) management of solid and liquid wastes; g) air emissions.

Previous Editions

Can’t find what you are looking for?

Please contact us at: