Search
×
FR

Placeholder headline

This is just a placeholder headline

API STD 521: Guide for Pressure-relieving and Depressuring Systems – Edition 6

$

682

BUY NOW

Placeholder headline

This is just a placeholder headline

API STD 653: Tank Inspection, Repair, Alteration, and Reconstruction – Edition 4

$

507

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:19 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series-18: Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z246.2-14 – Emergency preparedness and response for petroleum and natural gas industry systems

$

596

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:22 – Storage of hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z731-09 (R2014) – Emergency Preparedness and Response

$

177

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z662:23 – Oil and gas pipeline systems

$

1197

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA Z341 Series:26 – Storage of Hydrocarbons in underground formations

$

878

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA B51:24 Boiler, Pressure Vessel, and Pressure Piping Code

$

389

BUY NOW

API RP 100-2

API RP 100-2: Environmental Aspects Associated with Exploration and Production Operations including

CDN $195.00

This publication was last reviewed and confirmed in 2020.

SKU: 3622ca91ad08 Category:

Description

This document provides recommended practices applicable to the planning and operation of wells, and hydraulically fractured wells. Topics covered include recommendations for managing environmental aspects during planning; site selection; logistics; mobilization, rig-up, and demobilization; and stimulation operations. Also, this document includes guidance for managing environmental aspects during well construction; however, guidance for well construction and fracture stimulation design and execution for onshore wells that can be hydraulically fractured are described in API 100-1. This document provides recommendations for the following topics: a) baseline groundwater sampling; b) source water management; c) material selection; d) transportation of materials and equipment; e) storage and management of fluids and chemicals; f) management of solid and liquid wastes; g) air emissions.

Edition

1

Published Date

2015-08-05

Status

Reaffirmed

Pages

62

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document provides recommended practices applicable to the planning and operation of wells, and hydraulically fractured wells. Topics covered include recommendations for managing environmental aspects during planning; site selection; logistics; mobilization, rig-up, and demobilization; and stimulation operations. Also, this document includes guidance for managing environmental aspects during well construction; however, guidance for well construction and fracture stimulation design and execution for onshore wells that can be hydraulically fractured are described in API 100-1. This document provides recommendations for the following topics: a) baseline groundwater sampling; b) source water management; c) material selection; d) transportation of materials and equipment; e) storage and management of fluids and chemicals; f) management of solid and liquid wastes; g) air emissions.

Previous Editions

Can’t find what you are looking for?

Please contact us at: