Search
×
FR

Placeholder headline

This is just a placeholder headline

ISO/TR 42505:2026 Sharing economy — Shared manufacturing — Concepts and models

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 4306-1:2026 Cranes — Vocabulary — Part 1: General

$

436

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 21316:2026 Traditional Chinese medicine — Isatis indigotica root

$

192

BUY NOW

Placeholder headline

This is just a placeholder headline

TEMA 11th Edition – Book of Standards (Not for Resale)

$

0

BUY NOW

API RP 16ST

API RP 16ST, 2nd Edition: Coiled Tubing Well Control Equipment Systems

CDN $373.00

Coiled Tubing Well Control Equipment Systems

SKU: c45ea57b39e7 Category:

Description

This Recommended Practice (RP) addresses coiled tubing well control equipment assembly and operation as it relates to well control practices. Industry practices for performing well control operations using fluids for hydrostatic pressure balance are not addressed in this RP. This document covers well control equipment assembly and operations used in coiled tubing intervention and coiled tubing drilling/milling applications performed through: — tree equipment constructed in accordance with API 6A or API 11IW or both, — a surface flow head or surface test tree constructed in accordance with API 6A, — a fracture stimulation wellhead assembly (with at least two gate valves installed for isolation), — drill pipe or workstrings with connections manufactured in accordance with API 5CT, API 5DP or API 7-1, or a combination thereof.

Edition

2

Published Date

2021-02-11

Status

Current

Pages

131

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This Recommended Practice (RP) addresses coiled tubing well control equipment assembly and operation as it relates to well control practices. Industry practices for performing well control operations using fluids for hydrostatic pressure balance are not addressed in this RP. This document covers well control equipment assembly and operations used in coiled tubing intervention and coiled tubing drilling/milling applications performed through: — tree equipment constructed in accordance with API 6A or API 11IW or both, — a surface flow head or surface test tree constructed in accordance with API 6A, — a fracture stimulation wellhead assembly (with at least two gate valves installed for isolation), — drill pipe or workstrings with connections manufactured in accordance with API 5CT, API 5DP or API 7-1, or a combination thereof.

Previous Editions

Can’t find what you are looking for?

Please contact us at: