
API RP 65-3
API RP 65-3: Wellbore Plugging and Abandonment – Edition 1
CDN $221.00
Description
This document provides guidance for the design, placement, and verification of cement plugs in wells to be temporarily or permanently abandoned, as well as remediation and verification of annular barriers. Wells temporarily abandoned (suspended) are intended to be re-entered in the future. The placement of barriers may depend on whether the well is to be temporarily or permanently abandoned. Cement plug lengths are not considered in this document.
Edition
1
Published Date
2021-06-07
Status
Current
Pages
53
Format 
Secure PDF
Secure – PDF details
- Save your file locally or view it via a web viewer
- Viewing permissions are restricted exclusively to the purchaser
- Device limits - 3
- Printing – Enabled only to print (1) copy
See more about our Environmental Commitment
Abstract
This document provides guidance for the design, placement, and verification of cement plugs in wells to be temporarily or permanently abandoned, as well as remediation and verification of annular barriers. Wells temporarily abandoned (suspended) are intended to be re-entered in the future. The placement of barriers may depend on whether the well is to be temporarily or permanently abandoned. Cement plug lengths are not considered in this document.
Previous Editions
Can’t find what you are looking for?
Please contact us at:
Related Documents
-

API TR 10TR1: Cement Sheath Evaluation
CDN $311.00 Add to cart -

API RP 10B-4: Preparation and Testing of Foamed Cement Slurries at Atmospheric Pressure
CDN $204.00 Add to cart -

API RP 10B-6: Recommended Practice on Determining the Static Gel Strength of Cement Formulations
CDN $135.00 Add to cart -

API TR 10TR3: Temperatures for API Cement Operating Thickening Time Tests
CDN $338.00 Add to cart







