Sky Bear Technical Standards - Home
Search
×
FR

Placeholder headline

This is just a placeholder headline

CSA A123.21:26 – Standard test method for the dynamic wind uplift resistance of membrane-roofing systems

$

236

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-A123.2-03 (R2023) – Asphalt-coated roofing sheets

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

A123.23-15 (R2025) – Product specification for polymer-modified bitumen sheet, prefabricated and reinforced

$

118

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.24:21 (R2026) – Standard test method for wind resistance of vegetated roof assembly

$

161

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.25:18 (R2023) – Asphalt core boards used in roofing

$

197

BUY NOW

Placeholder headline

This is just a placeholder headline

A123.3-05 (R2020) – Asphalt saturated organic roofing felt

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

CAN/CSA-A123.4-04 (R2023) – Asphalt for constructing built-up roof coverings and waterproofing systems

$

150

BUY NOW

Placeholder headline

This is just a placeholder headline

CSA A123.5:16 (R2020) – Asphalt shingles made from glass felt and surfaced with mineral granules

$

197

BUY NOW

S851-12

S851-12 – Post-blast safety evaluation of buildings

CDN $147.00

Post-blast safety evaluation of buildings

SKU: 2422093 Categories: ,

Description

Preface This is the first edition of CSA S851, Post-blast safety evaluation of buildings. Scope 1.1 This Guideline specifies procedures for the assessment of the safety of the structural and architectural components of a building affected by a blast event. 1.2 This Guideline does not contain procedures for assessing all post-blast hazards or pre-existing risks, but they should be considered. 1.3 The principles and criteria of post-blast assessment may be incorporated into existing emergency response protocols. 1.4 In this Guideline, “should” is used to express a recommendation or that which is advised but not required; “may” is used to express an option or that which is permissible within the limits of the Guideline; and “can” is used to express possibility or capability.

Edition

Not found

Published Date

2026-10-05

Status

Not found

Pages

74

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

Preface This is the first edition of CSA S851, Post-blast safety evaluation of buildings. Scope 1.1 This Guideline specifies procedures for the assessment of the safety of the structural and architectural components of a building affected by a blast event. 1.2 This Guideline does not contain procedures for assessing all post-blast hazards or pre-existing risks, but they should be considered. 1.3 The principles and criteria of post-blast assessment may be incorporated into existing emergency response protocols. 1.4 In this Guideline, "should" is used to express a recommendation or that which is advised but not required; "may" is used to express an option or that which is permissible within the limits of the Guideline; and "can" is used to express possibility or capability.

Previous Editions

Can’t find what you are looking for?

Please contact us at: