REGISTER

FR
Search
×
FR

Placeholder headline

This is just a placeholder headline

API SPEC 7-1: Rotary Drill Stem Elements

$

342

BUY NOW

Placeholder headline

This is just a placeholder headline

API SPEC 7-1: Rotary Drill Stem Elements: Errata 2

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

ISO 5267-2:2025 Pulps – Determination of drainability – Part 2: “Canadian Standard” freeness method

$

182

BUY NOW

Placeholder headline

This is just a placeholder headline

MSS SP-106-2025: Cast Copper Alloy Flanges and Flanged Fittings: Class 125, 150, and 300

$

174

BUY NOW

Placeholder headline

This is just a placeholder headline

API 5L8: Field Inspection of New Line Pipe

$

240

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids

$

388

BUY NOW

Placeholder headline

This is just a placeholder headline

API RP 13B-2: Field Testing Oil-based Drilling Fluids: Errata 1

$

0

BUY NOW

Placeholder headline

This is just a placeholder headline

API TR 2WSIM: Weathervaning System Integrity Management

$

227

BUY NOW

Placeholder headline

This is just a placeholder headline

API 570: Piping Inspection Code: In service Inspection, Rating, Repair, and Alteration of Piping Systems

$

359

BUY NOW

API RP 100-1

API RP 100-1: Hydraulic Fracturing — Well Integrity and Fracture Containment

CDN $176.97

This publication was last reviewed and confirmed in 2020.

SKU: a78c924d79a5 Category:

Description

This document contains recommended practices for onshore well construction and fracture stimulation design and execution as it relates to well integrity and fracture containment. These practices cover the design and installation of well equipment that protects and isolates ground water aquifers, delivery and execution of the hydraulic fracture treatment, and contains and isolates the produced fluids. This document also addresses the design and execution of hydraulic fracturing treatments to contain the resulting fracture within a prescribed geologic interval. Fracture containment combines those parameters that are existing, those that can be established at installation, and those that can be controlled during execution.

Edition

1

Published Date

2015-10-08

Status

Reaffirmed

Pages

40

Language Detail Icon

English

Format Secure Icon

Secure PDF

Abstract

This document contains recommended practices for onshore well construction and fracture stimulation design and execution as it relates to well integrity and fracture containment. These practices cover the design and installation of well equipment that protects and isolates ground water aquifers, delivery and execution of the hydraulic fracture treatment, and contains and isolates the produced fluids. This document also addresses the design and execution of hydraulic fracturing treatments to contain the resulting fracture within a prescribed geologic interval. Fracture containment combines those parameters that are existing, those that can be established at installation, and those that can be controlled during execution.

Previous Editions

Can’t find what you are looking for?

Please contact us at: